Similar Projects
One Time Purchase of Electrical Supplies for Repairs at Waggaman Playground
Term Contract
Sub-Bidding
$194,000 CJ est. value
Westwego, LA 70094

Colony Place Street Lighting
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Metairie, LA 70003

Electrical Generator and Diesel Engine (Fire Pump)Maintenance Service
Alteration
Post-Bid
New Orleans, LA

Electrical Repairs
Alteration
Post-Bid
New Orleans, LA 70130

Dosker B Building Electrical Upgrades
Results
Louisville, KY

Electrical Services
Term Contract, Alteration
Results
Louisville, KY

Group Residential Solar Photovoltaic (PV) Installation Services
Term Contract
Sub-Bidding
Louisville, KY 40202

Upgrade Electrical Infrastructure - Installation of Loop 5
Alteration
Post-Bid
New Orleans, LA

MFWQTC FEPS Loadcenter and MCC Replacement
Alteration
Results
$500,000 to $700,000 est. value
Louisville, KY 40211

Aeon Hylite Pnr Series Led Lighting Fixtures
Infrastructure
Post-Bid
Thibodaux, LA 70301

Furnish all Labor, Materials and Equipment Necessary to Remove and Replace Lighting and Install Hand Dryers for Jefferson Parish East Bank Drainage
Alteration
Results
Gretna, LA

Electrical Supplies and Lighting (Line Item)
Alteration
Post-Bid
KY

Cast Iron Street Light Access Panels
Alteration
Results
New Orleans, LA

Supply and Install Electrical Outlets onto Existing Utility Poles for the Jefferson Parish Parkways Department
Alteration
Post-Bid
LA

Raw Water Generator Pad and Chemical Feed Improvements
Alteration
Results
Wellington, KY

Last Updated 12/02/2022 12:52 AM
Project Title

Two (2) Year Contract for Street Lighting Maintenance for the Westbank Harry Lee Expressway for the Jefferson Parish Engineering Department

Physical Address View project details and contacts
City, State (County) Kenner, LA 70065   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A 5% surety bond is required with the bid submission. 2. A Performance Bond in 50% of the contract amount is due at the signing of the formal contract. 3. A Payment Bond in 50% of the contract amount is due at the signing of the formal contract The Jefferson Parish Westbank/Harry Lee Expressway Roadway and Pathway lighting system equipment is located on the Westbank of Jefferson Parish and includes underground, overhead as well as elevated conduit, wiring, service connections points, foundations, poles and lighting controllers (with accompanying materials as specified). NOTE: As-built Drawings, Plans and Specifications shall be available to the contractor on an as needed basis. Any changes or modifications to the system(s) drawings shall require inspections, documentation and returned the Street Lighting Division. Bidders should submit all questions in writing via email to the buyer's email address as indicated above, no later than Five (5) working days prior to the bid opening. Bid numbers should be mentioned in all requests. If submitting online, vendors may send questions via the E-Procurement site no later than Five (5) working days prior to the bid opening

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents