Similar Projects
Tidal Wave Car Wash / St Peters
New Construction, Infrastructure - 5,400 SF
Design
$1,400,000 CJ est. value
Saint Peters, MO 63376

Jim Hennessey Trail Extension to Meadowlake Drive
Infrastructure
Bidding
$129,907 CJ est. value
Cottleville, MO 63304

Jim Hennessey Trail Extension to Meadowlake Drive
Infrastructure
Bidding
$129,907 CJ est. value
Cottleville, MO 63304

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Parks Asphalt Paving
Infrastructure
Post-Bid
Foristell, MO 63348

Pavement Sealing and Striping of Justice Center and Water Treatment Facilities Parking Lots
Results
Saint Peters, MO

Great Oaks Turn Lane Addition
Infrastructure
Results
Wentzville, MO

Little Sunshine's Playhouse & Preschool
New Construction, Infrastructure - 11,354 SF
Pending Verification
$2,000,000 CJ est. value
Lake Saint Louis, MO 63367

Kisker And Route 364 Self Storage
New Construction, Infrastructure - 124,032 SF
Pending Verification
$14,000,000 CJ est. value
Saint Peters, MO 63376

Spring Lakes #1 Lift Station Improvements
Infrastructure, Renovation
Bidding
$800,000 CJ est. value
Cottleville, MO 63366

Asphalt Removal and Replacement
Infrastructure
Post-Bid
Cottleville, MO

Hanley Road Reconstruction and Improvements
Infrastructure
Results
Dardenne Prairie, MO

Mount Carmel Senior Living / O'Fallon
New Construction, Infrastructure
Pending Verification
$6,400,000 CJ est. value
Cottleville, MO 63366

Flow Meter Calibration
Infrastructure
Bidding
$68,000 CJ est. value
Cottleville, MO 63366

Implementing Traffic Control Signaling Devices and Roadway Improvements
Infrastructure, Alteration
Post-Bid
Wentzville, MO

Last Updated 09/12/2022 01:09 PM
Project Title

St. Charles Fire Station 3

Physical Address View project details and contacts
City, State (County) Saint Charles, MO 63301   (Saint Charles County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $4,360,456 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 15, 2022 , this project has not yet been awarded. The project is expected to be awarded on September 6, 2022. Scope of Work Page 1 of 8 The Owner Representative (OR) referred to below is Navigate Building Solutions, LLC. The Owner referred to below is the City of St. Charles MO. The Contractor referred to below is the General Works Contractor. This bid package includes, but is not limited to, the following: All work outlined by the project documents (plans and specifications) issued by JEMA Architects dated June 24, 2022 1. Contractor is aware of the potential for Liquidated Damages. Contractor shall be responsible to maintain scheduled items for the Contractor's work as included in the project master schedule below. Contractor shall reference the Construction Agreement contract draft provided in the bid documents, Contractor agrees to pay the Owner, or to deduct from the Contract Sum, not as a penalty, but as liquidated damages, the amounts listed in the contract drafts provided. 2. The draft Construction Agreement has been included. Contractor shall read and agree to these documents as part of the bid process. 3. Upon execution of this contract, this contractor must submit to the OR a detailed critical path baseline construction schedule outlining each construction activity and phase. This schedule must fall within the master project schedule outlined below and be submitted no later than twenty-one (21) days following execution of the contract. Contractor is required to provide updated work schedules on a weekly basis. Contractor’s detailed activity schedule/critical path schedule shall adhere to the master project schedule. Should the Contractor fall behind schedule by more than 5 work days due to the fault of this Contractor, the Contractor shall provide a recovery schedule to the Owner Representative within 5 days of request by the Owner Representative. Project Master Schedule/Milestone Dates: Receipt of Bids August 4, 2022 at 2:00pm Supplemental Bid Documents Due August 5, 2022 at 2:00pm Tentative Pre-Award Interviews August 6-7, 2022 at TBD Board Approval of Contractor August 16, 2022 Notice to Proceed (Day 1) September 9, 2022 Groundbreaking Date TBD by Owner Substantial Completion (Day ___*) *Based on Bidders Proposed Duration Completion of Punchlist/Final Completion 30 Day’s After Substantial Completion 4. The project is prevailing wage. All wages paid for work performed on site must comply with the Missouri Division of Labor Standards Annual Wage Order Number 29 for St. Charles County, Missouri. 5. Certified Payroll will be a requirement of this project. 6. Provide all supervision, labor, tools, equipment and materials to complete the work. 7. Perform all freight, unloading, loading, distribution and hoisting of materials. 8. Furnish, install, maintain and remove temporary on-site trailers and storage containers as required to perform the work. This contractor shall provide in the jobsite trailer a conference table and chairs for contractor weekly foreman meetings, bi-weekly Owner meetings, and other meetings as needed. *Addendum 1 has been issued.

Details

2 Stories Above Grade, 8,600 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents