Similar Projects
Z--INDE 236306-Replace Chiller Plants/Cooling Towers
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19106

Replace Chiller Plants/Cooling Towers
Infrastructure
Design
Philadelphia, PA 19106

Major HVAC Renovations at Richard R Wright Elementary School - General
Alteration
Bidding
$354,163 est. value
Philadelphia, PA 19132

Major HVAC Renovation - Richard R. Wright Elementary School - General
Alteration
Bidding
$146,028 est. value
Philadelphia, PA

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

Radiator Covers
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA

Replace Ventilation at Independence Mall Parking Garage
Results
Philadelphia, PA 19106

NSWCPD Building 666, Installation of New Exhaust Fan
Results
$25,000 to $100,000 est. value
Philadelphia, PA 19112

Design-Bid-Build (DBB), Building 633 River Water Cooling System, Philadelphia Naval Business Center (PNBC), Philadelphia, PA
Post-Bid
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19092

Grease Trap, Hood and Vent Cleaning for 4th Floor Kitchen
Results
Philadelphia, PA

New Hvac Unit
Renovation
Post-Bid
Philadelphia, PA

Machine Chiller Semi-Annual Preventative/Corrective Maintenance for NFPC
Results
Philadelphia, PA 19112

Wall Seal and Exhaust Fan Support Repairs
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Thomas G. Morton HVAC Replacement - General Construction
Results
Less than $169,177 est. value
Philadelphia, PA 19142

Maintenance, Repair and Inspection Services for Nederman Exhaust Systems
Term Contract
Post-Bid
Philadelphia, PA 19102

Last Updated 01/21/2022 12:20 PM
Project Title

Zinc Orthophospate Storage and Feed System Replacement - HVAC Construction

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19136   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Goals - MBE: 15% - 20% and WBE: 10% - 12%. HVAC Work required to support zinc orthophosphate system improvements including procurement and installation of fans, duct, unit heaters, and associated appurtenances and control within the Zinc Orthophosphate Building; as specified and as shown on the HVAC Plans and as described in the specifications, and all appurtenant work and materials necessary to produce a complete installation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents