Similar Projects
Appleton DAF Conversion to Receiving Tank 2
Infrastructure
Bidding
Appleton, WI 54915

Bldg. 203 W5 Tank Replacement
Addition
Post-Bid
Milwaukee, WI 53207

High-Vacuum Chamber Modification
Post-Bid
Madison, WI

Well #1 / #2 Storage Reservoir & Booster Pump Addition
Results
WI

2020 Digester and Storage Tank Cleaning
Results
Madison, WI 53713

Tower Site Construction
Infrastructure
Post-Bid
WI

Softener System Modifications
Results
Less than $180,000 est. value
Madison, WI

Cleaning, Repairing, and Painting
Infrastructure
Post-Bid
Burlington, WI

Elevated Spheroid Repainting and Repairs
Results
$389,500 est. value
WI

Washburn Water Tower Painting and Mixing
Results
Oshkosh, WI 54904

Elevated Tank Repaint
Term Contract
Results
Brookfield, WI

Lincoln Avenue 1.0 Mg Composite Water Tower Rehabilitation
Renovation
Results
Plover, WI

Frank H Elevated Tank Repainting
Results
Waunakee, WI

Dilution and Mixing Tanks 1 and 2 Rehabilitation
Results
Milwaukee, WI

Water Tower Rehabilitation
Results
WI

Last Updated 09/10/2021 09:19 AM
Project Title

Coagulant System

Physical Address View project details and contacts
City, State (County) Cedarburg, WI   (Ozaukee County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes but is not limited to installation of a new bulk coagulant storage tank, new chemical metering pumps, a new orthophosphate analyzer, removal of the old tank, new control wiring, new power circuits, and associated piping

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents