Similar Projects
Mountain Bike Trail Construction
Infrastructure
Bidding
$79,200 est. value
Allentown, Schnecksville, PA 18078

Sidewalk Replacement and Curb Repair
Infrastructure
Bidding
$300,000 est. value
Schnecksville, PA

2022 ADA Pedestrian Ramp Program
Infrastructure
Post-Bid
Allentown, PA

Lehigh Valley Campus Storm Water Restoration Work
Infrastructure
Post-Bid
$60,000 est. value
Center Valley, PA 18034

Cedar Creek Parkway West - Phase 2 Development Project
Results
Allentown, PA 18104

2021 Curb and Concrete Contractor
Results
$30,000 to $40,000 est. value
Emmaus, PA 18049

Pine Street Handicap Ramps Project
Infrastructure
Post-Bid
$300,000 est. value
Hokendauqua, PA 18052

2021 Handicap Ramps, Curb and Sidewalk Improvements
Results
Fullerton, PA 18052

2021 11 Street Overlay and Curb Ramps
Results
$600,000 to $800,000 est. value
Bethlehem, PA

2021 CDBG ADA Pedestrian Ramp Program (Various Locations)
Infrastructure
Results
Allentown, PA

Parkway Manor Elementary School Student Drop-Off Improvements
Infrastructure
Results
Allentown, PA 18104

Parking Lot at N. 7th Street and N. Penn Street
Infrastructure
Results
Allentown, PA 18102

2020 CDBG East Church Street and ADA Improvements
Infrastructure
Results
Slatington, PA 18080

Allentown Jordan Creek Greenway Trail
Infrastructure
Results
$2,500,000 to $4,999,999 est. value
Allentown, PA

2021 Curb and Sidewalk Work for the 2022 Streets Program (Various Locations)
Infrastructure
Results
Allentown, PA

Last Updated 06/20/2022 06:05 AM
Project Title

2022 ADA Handicap Ramps, Curb and Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Hokendauqua, PA   (Lehigh County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the Project involves the 2022 Construction of about 27 ADA Handicap Ramp Corners along five (5) Street Projects within Whitehall Township. 1) Pennsylvania Street (8) Ramp Corners - Fullerton Area (from Richland Street Alley, North 13th Street to Mercer Street Alley). 2) Tremont Street (4) Ramp Corners - Fullerton Area (from North 9th Street to North 10th Street). 3) Quarry Street (6) Ramp Corners - Fullerton Area (from 2nd Street to Mulberry Alley). 4) South 2nd Street (3) Ramp Corners - Hokendauqua Area (from South Street to Birch Street Alley) and 5) Carbon Street (6) Ramp Corners - Hokendauqua Area (from North 2nd Street to North 3rd Street). The Total Estimated Concrete Curb and Sidewalk Replacement Quantities for all five (5) Street Projects is approx. 500 Ft. of Concrete Curbing and approx. 2,000 Sq. Ft. of Concrete Sidewalks.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents