Similar Projects
Last Updated | 03/28/2023 02:20 PM |
Project Title | Shoreline Drive Pilot Road Diet |
Physical Address | View project details and contacts |
City, State (County) | Muskegon, MI 49440 (Muskegon County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $16,825 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The staff accept the bid from Give Em A Brake Safety only for Phase 1 and Phase 2 Traffic Control during the Fall of 2022 in the amount of $16,825 in conjunction with the Shoreline Drive Road Diet Pilot and delay a decision on Phase 3 Traffic Control until results of the Fall Pilot are available for consideration. Shoreline Drive Pilot Road Diet Contractor shall not be responsible for removing or remediating any Hazardous Environmental Condition encountered, uncovered, or revealed at the Site unless such removal or remediation is expressly identified in the Contract Documents to be within the scope of the Work. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |