Similar Projects
The Gables On Lawrence
New Construction, Infrastructure
Conception
$51,000,000 CJ est. value
Fairhope, AL 36532

Waterway Village Pedestrian Bridge - City of Gulf Shore
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Gulf Shores, AL 36542

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

AC Water Main Replacement Part A - SR-59 and Pedestrian Bridge
Infrastructure
Bidding
$600,000 CJ est. value
Gulf Shores, AL 36542

The Haven Animal Shelter Major Facade and Remodel
Build-out, Renovation
Bidding
$600,000 CJ est. value
Fairhope, AL 36532

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Country Club Drive Water Main Replacement Phase A- Wedgewood Drive to Fairway
Infrastructure
Post-Bid
$300,000 CJ est. value
Daphne, AL 36526

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Palmetto Ridge Townhouses
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Gulf Shores, AL 36542

Harbor Club Condominiums / Orange Beach
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Orange Beach, AL 36561

U-Haul Self-Storage Facility / Daphne
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Daphne, AL 36526

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

Last Updated 06/26/2023 12:10 PM
Project Title

Final Design for Baldwin County Material Recovery Facility Building

Physical Address View project details and contacts
City, State (County) Bay Minette, AL 36507   (Baldwin County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All bids must be on blank forms provided in the Specifications with the Contract booklet submitted in its entirety. A cashiers check drawn on an Alabama bank or a Bidders Bond, payable to Baldwin County, Alabama, for an amount not less than five percent (5%) of the amount bid, but in no event more than ten thousand dollars ($10,000) shall be filed with the proposal. The bidder's bond shall be prepared on the form specified and signed by a bonding company authorized to do business in the State of Alabama. A performance bond in the form and terms approved by the County in an amount not less than the contract price will be required at the signing of the contract. A labor and materials bond in the form and terms approved by the County in an amount not less than fifty percent (50%) of the contract price insuring payment for all labor and materials shall also be required at the signing of the contract. In addition, the Contractor must furnish to the County, at the time of the signing of the contract a certificate of insurance coverage as provided in the specifications The right is reserved to reject any and/or all bids and to waive informalities or irregularities in bid documents, and to furnish any item of material or work, and to change the amount of said contract consistent with applicable law. Liquidated damages for non-completion of the work within the time limit agreed upon will be assessed in accordance with the terms of the contract.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents