Similar Projects
Construction of Fire Station 6
New Construction - 11,000 SF
Conception
$2,700,000 est. value
Snow Camp, NC 27349

New Police Department Building and Fire/EMS Substation
New Construction - 10,000 SF
Conception
Kitty Hawk, NC 27949

Washington Police Department
New Construction
Design
$4,000,000 est. value
Washington, NC

River Lights Fire Station
New Construction - 13,873 SF
Design
$5,700,000 est. value
Wilmington, NC 28402

Fire Station 3 Rebuild
New Construction - 12,472 SF
Bidding
$2,900,000 est. value
Winston-Salem, NC

Police-Fire Rescue Restroom Renovations
Renovation
Bidding
Greenville, NC 27834

New High Point Police Station Project
New Construction - 80,000 SF
Post-Bid
High Point, NC

Jackson Street EMS
Post-Bid
$1,500,000 est. value
Murphy, NC 28906

Concord Fire Station No. 10
New Construction
Results
Concord, NC

Design Build Fire Station Facility Repair
Renovation
Results
Less than $7,000,000 est. value
Camp Lejeune, NC 28547

Westfield Volunteer Fire Department
Renovation, Addition
Construction
Westfield, NC 27053

Fire Station 22
New Construction - 16,500 SF
Construction
Raleigh, NC

New Police Station
New Construction
Pending Verification
Wendell, NC 27591

Fire Station 3
New Construction
Conception
Apex, NC 27539

New North Fire Station
Design
Laurinburg, NC 28352

Last Updated 11/18/2021 03:36 PM
Project Title

Design and Construction of Fire Station No. 51

Physical Address View project details and contacts
City, State (County) Leland, NC 28451   (Brunswick County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected December 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design-Build Project delivery services for Fire Station 51. This facility will improve Fire Department response times in support of the rapid growth of development within the Town’s fire district limits. The completed facility will be comprised of an approximately 8,000+/- square foot, single-story, 3 bay building with commercial and residential spaces as outlined below, as well as other support facilities. Construction of the facilities should begin by Spring 2021. Preliminary needs include, but are not limited to, the following (size estimates are approximate): 1. 6 Bedrooms (150 sf each). 2. Fitness Room (400 sf). 3. 2 Offices (100 sf each). 4. Common Area Restroom (55 sf). 5. 2 Staff Bathrooms w/Showers (65 sf each). 6. Dayroom and Kitchen (800 sf). 7. Covered Patio (400 sf). 8. Combination Gear Wash and Decontamination Room (250 sf). 9. Laundry Room (100 sf). 10. Pantry (80 sf). 11. Emergency Generator.

Details

Fire/Police Station, 1 Story Above Grade, Approximately 8,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents