Similar Projects
Transfer Station Concrete
Alteration
Results
Sanbornton, NH

1.5 MG Water Storage Tank Rehabilitation
Renovation
Results
$525,000 CJ est. value
Swanzey, NH 03446

Frost Free Library Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Marlborough, NH 03455

Highway Department Items - Block and Concrete Products
Term Contract
Results
Pelham, NH

Greenfield State Park Pot Washing Stations Slabs and Firewood Shed Foundation
Alteration
Results
Greenfield, NH 03047

Cleveland Fb Temporary Concrete Repairs
Term Contract
Results
$25,000 to $100,000 est. value
Concord, NH

Concrete (Delivered and/or Pumped)
Term Contract
Post-Bid
Concord, NH 03301

Concrete (Delivered and/or Pumped)
Term Contract
Post-Bid
Concord, NH 03301

Signal / ITS Prime
Infrastructure
Post-Bid
$2,186,825 CJ est. value
Concord, NH 03301

Concrete (Delivered and/or Pumped)
Term Contract
Post-Bid
Concord, NH 03301

Bleacher Concrete Pad
Alteration
Post-Bid
Windham, NH 03087

Beach Grading at Hampton Beach State Park
Infrastructure
Bidding
$16,875 CJ est. value
Hampton, NH 03842

Precast Concrete Structures
Alteration
Results
Dover, NH

Tara Estates Sewer Pump Station Upgrade
Renovation
Results
$1,376,500 CJ est. value
Rochester, NH 03867

Bellamy Ridge (Red Barn Drive) Completion
Infrastructure
Post-Bid
$700,000 CJ est. value
Dover, NH 03820

Last Updated 02/06/2023 01:04 AM
Project Title

Poverty Lane Paving

Physical Address View project details and contacts
City, State (County) Lebanon, NH 03766   (Grafton County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $338,664 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Lebanon Public Works Department is seeking bids for milling and paving work on 10,000of Poverty Lane. This work will consist of milling 7,000 LF x 22(1.5average depth) plus 3,000 LF x 22' (1average depth); followed by 3/4" shim layer over the entire 10,000 plus 1.75 overlay on the 7000section and 1.25overlay on the 3,000 section. This will be followed up with shoulder backup of the pavement. Work will include shim and final overlays (NHDOT Section 401; 3/8 mix shim course and 1/2 Inch mix top course). An add option will be to shim (1/2" thick) and overlay (1" thick) a 1.0 mile of Stoney Brook Road located off of Exit 17.This work will be included if funding is available at the end of the 2022 calendar year city budget. The 1,000' +/- of Stoney Brook Road beyond the initial 1.0 miles will be considered in 2023 based on funding and the limits of the existing Right-of-Way. Question Submission Deadline:December 15, 2022, 2:00pm Question Response Deadline:December 15, 2022, 5:00pm

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents