Similar Projects
Administrative Services Building Remodel
Renovation
Conception
Rochelle, IL 61068

Auxiliary Thermal Oil Heater - 14A10 - North Shore Water Reclamation District
Renovation
Conception
Less than $596,600 est. value
Gurnee, IL

Judicial Complex Expansion
New Construction, Addition
Design
$19,800,000 est. value
Wheaton, IL

Bond County Courthouse (5) Restrooms and (1) Lactation room remodel project
Renovation
Bidding
$65,000 est. value
Greenville, IL

Courthouse Infrastructure Improvement
Renovation - 1,100 SF
Post-Bid
Mount Vernon, IL 62864

Elevator Modernization in the County Courthouse
Renovation
Post-Bid
Marion, IL 62959

DNR-Frank Holten Kitchen And Banquet Areas Remodel
Renovation
Results
East Saint Louis, IL 62205

Renovate Building Interior and Exterior (General)
Renovation
Results
Less than $1,500,000 est. value
Mount Vernon, IL 62864

Old Courthouse & Sheriffs House Renovation
Renovation
Construction
$13,250,000 est. value
Woodstock, IL

Village Hall Training Room
Build-Out
Post-Bid
Carol Stream, IL 60188

Renovate Building Interior and Exterior (Ventilation)
Renovation
Results
Less than $300,000 est. value
Mount Vernon, IL 62864

Window Treatments for City Hall Windows
Alteration
Post-Bid
Quincy, IL 62301

Council Chamber
Renovation
Results
North Chicago, IL

Gallatin County Courthouse Proposal
Renovation
Post-Bid
Shawneetown, IL

2nd Courtroom at Juvenile Justice Center
Renovation
Results
Saint Charles, IL 60175

Reported 07/15/2022 12:00 AM
Project Title

Clarendon Park Community Center Rehabilitation

Physical Address View project details and contacts
City, State (County) Chicago, IL 60640   (Cook County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids. Bids by Invitation.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $480,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

a. Site Work: Site work includes a combination of new ramp construction and modifications to existing stairs and stair handrails, replacement of walkways and site seating, installation of new areas for planting beds, and new drainage structures. Plant material to be provided and installed by others. b. Abatement: Abatement of asbestos containing materials (ACM) and lead based paint (LBP) is required at interior and exterior areas of work: see the HZ drawings. Any suspect materials not listed on the drawings shall be assumed and treated as hazardous until tested and proven otherwise. Contractor shall prepare an abatement project design and specifications prior to any renovation activities in which asbestos-containing materials or lead-based paint may be impacted. c. Roof Replacements Roof work includes: removal of all existing roofs and replacing with new PVC membrane roof system, including but not limited to: all associated roof work such as edge stops, flashings, sealing of penetrations, curbs, deck repairs, and insulation. d. Metal Fascia Replacements The project includes replacing the deteriorated metal fascia around the upper level of the building, including repairs to supports and soffits as required. e. Exterior Facade The bid documents describe the types and areas of exterior facade repairs. These repairs generally involve masonry and concrete building details such as: brick and brick unit replacement; salvage and reuse of original masonry; tuckpointing; crack repairs; spall repairs; limited limestone sill replacement, and grinding of joints. Areas of ivy removal are also identified. Project also includes the installation of a new main entrance facade and new window openings on the building. f. MEP Coordination Contractor cannot interrupt electrical service to any existing exterior park lighting or water to drinking fountains and hose bibs outside of the scope of work, for the duration of construction, without written permission from CPD Project Manager. If required, general contractor will install temporary electrical supply. i. Mechanical Mechanical scope includes, but is not limited to: new rooftop HVAC units, new hydronic piping, new fin tube radiators, new heat exchangers, new variable air volume (VAV) outlets, new exhaust fans, new ductwork and connection to the Park District’s Building Automation System (BAS). ii. Electrical Electrical scope includes, but is not limited to: removal and replacement of panelboards, breakers, conduits, feeders, hand dryers, light fixtures, emergency and exit light fixtures, meters, transformers, wiring, receptacles, switches, life safety equipment, and CO detectors on all levels. Also included are installation of new audiovisual (AV) equipment and associated data cables, outlets and associated electrical components. Salvage of electrical equipment is required with turnover to CPD. iii. Plumbing Plumbing scope generally includes, but is not limited to, the following: removal and replacement of underground storm piping fittings and fixtures, including removal and replacement of domestic water piping; removal and replacement of numerous plumbing fixtures, accessories and associated equipment at washrooms and janitor closets; and new drinking fountains. P-16008-050 Clarendon Park Community Center Rehabilitation Page 5 of 41 g. Interior Work: The interior scope of work includes, but is not limited to: new interior finishes such as plaster, paint, drywall and flooring; installation of new bleachers and basketball hoops; new interior glazed CMU block infill to match; new stairs and ADA ramps; cleaning, grinding and pointing at interior masonry; doors/windows including all hardware in compliance with Park District approved standards; and carpentry such as installation of new shelving at closets and new built-ins. Extra care must be taken to install fully supported protection over model railroad layouts to prevent debris and or/paint drips. Loose laid sheets, in plastic or any other material, in direct contact with layouts is prohibited at any stage of the project. h. New Elevator: The elevator scope of work includes, but is not limited to, the following: installation of new elevator, including but not limited to: all code-required communication systems, electrical, mechanical, elevator finishes, and all controls. i. Structural The structural scope includes, but is not limited to: installation of structural steel supports at new rooftop HVAC equipment and structural steel lintels at new openings. Structural work is also included at location of new elevator and elevator pit.

Details

Capitol/Court House/City Hall, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents