Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Design
Spokane, WA 99218

Sewer District Water Service Meter Installation and Water Distribution System BCE Consolidation Project
Infrastructure
Bidding
$600,000 est. value
Mesa, WA

Milwaukee and Aerotec Water Mains
Infrastructure
Bidding
$300,000 to $500,000 est. value
Moses Lake, WA

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

SR 162 East Water Main Replacement Phase 2 and 3
Infrastructure
Bidding
$200,000 est. value
Puyallup, WA 98375

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

42nd Avenue South Sewer Capacity Improvement
Infrastructure
Bidding
$223,750 est. value
Seattle, WA 98168

SR 224 Van Giesen Improvement Phase One
Infrastructure
Post-Bid
West Richland, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

148th Ave SE Water Main Extension
Infrastructure
Bidding
$500,000 est. value
Covington, WA 98042

Reported 05/12/2022 12:00 AM
Project Title

2022 Archie Anderson Park Water Main Replacement

Physical Address View project details and contacts
City, State (County) Longview, WA 98632   (Cowlitz County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes replacement of 6-inch cast iron water main with 1,216 linear feet of 8-inch restrained joint ductile iron pipe, connection of (2) water services, installation of (3) fire hydrants with 30 feet of 6-inch restrained joint ductile iron pipe, 1060 linear feet of 4 foot sidewalk, and restoration of existing pavement surfaces, and other incidentals as necessary to complete all of the work in accordance with the contract, plans, contract provisions and the standard specifications.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents