Similar Projects
Wingfoot Lake Dam Improvements
Renovation
Bidding
$186,781 est. value
Mogadore, OH 44260

Tainter Gate Parallel Shaft Speed Gear
Post-Bid
Delaware, OH 43015

Youngstown Dam Removals Project
New Construction
Post-Bid
Youngstown, OH

Muskingum River Lock and Dam No. 7 Mcconnelsville Dam Replacement Design/Build
Results
Less than $7,300,000 est. value
McConnelsville, Minerva Park, OH 43229

Muskingum River Lock and Dam No. 7 Mcconnelsville Dam Replacement Design/Build
Results
Less than $7,300,000 est. value
McConnelsville, Minerva Park, OH 43229

Muskingum River Parkway Lock & Dam Irrms
Renovation
Post-Bid
$13,400,000 est. value

Statewide Dam Improvements CMAR
Results
Less than $17,930,000 est. value
Celina, Circleville, Lake Milton, Van Buren, OH

Statewide Dam Improvements
New Construction
Post-Bid
$24,800,000 est. value

Brightwood Lake Dam Removal and Kellogg Creek Restoration
Results
Concord, OH 44077

WIO Culvert Valve Bulkhead Repairs
Term Contract
Post-Bid
Newport, OH 45768

Greenlawn Dam Safety Barrie
Results
Columbus, OH

Zoar Levee Repair
Results
$5,000,000 to $10,000,000 est. value
Zoar, OH

Gantry Crane Replacement for Flood Control Dam at Cincinnati Mill Creek Barrier Dam Facility
Results
Cincinnati, OH 45204

Village Dam Concrete Repair/Replacement
Results
$55,500 est. value
OH

2020 Pedestrian Tunnel Maintenance - Carnoustie Drive North of Aryshire Drive
Results
Dublin, OH 43016

Last Updated 11/09/2021 11:06 AM
Project Title

2021 Sunny Lake Dam Improvements

Physical Address View project details and contacts
City, State (County) Aurora, OH   (Portage County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000 to $1,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the proposed project involves bringing the Sunny Lake Dam into compliance with ODNR requirements. The improvements include raising the dam approximately 2-feet, providing new principal spillways, a new emergency spillway, and rebuilding the trail along the top of the embankment.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents