Similar Projects
Burns/Mather/ Cross Water Line Design And Construction - 6064-2020-04 - City of McCall
Infrastructure
Conception
$950,000 CJ est. value
McCall, ID 83638

Wooley Avenue Reconstruction - City of McCall
Infrastructure
Conception
$1,625,000 CJ est. value
McCall, ID 83638

Apron Construction - Rehabilitate Hangar Taxiways - 2956-2018-07 - City of McCall
Renovation, Infrastructure
Design
$950,000 CJ est. value
McCall, ID 83638

RFP D/B - Cascade City Shop
New Construction, Infrastructure - 2,400 SF
Bidding
$3,000,000 CJ est. value
Cascade, ID 83611

McCall Field Campus
New Construction, Infrastructure
Post-Bid
$39,440,000 CJ est. value
McCall, ID 83638

Lift Station 52 Bypass Project
Infrastructure
Post-Bid
$850,000 CJ est. value
McCall, ID 83638

Big Horn Residential Development
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
McCall, ID 83638

Highway 55 Graphics Studio
New Construction, Infrastructure - 3,010 SF
Pending Verification
$800,000 CJ est. value
McCall, ID 83638

Apron Reconstruction - 2956-2018-04 - City of McCall
Infrastructure
Conception
$1,300,000 CJ est. value
McCall, ID 83638

RFP Design - Architectural proposals - New Hospital
New Construction, Infrastructure
Post-Bid
$19,500,000 CJ est. value
Cascade, ID 83611

Stor-It Self Storage / McCall
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
McCall, ID 83638

Infield Development Area Taxiways - 2956-2022-07 - City of McCall
Infrastructure
Conception
$800,000 CJ est. value
McCall, ID 83638

RFQ D/B - Utility Building/Garages, Lake Cascade State Park
New Construction, Infrastructure
Post-Bid
$150,000 CJ est. value
Cascade, ID 83611

Simmons Street Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
McCall, ID 83638

Wooley Separated Pathway Phase II - 2859-2020-01 - City of McCall
Infrastructure
Conception
$321,829 CJ est. value
McCall, ID 83638

Last Updated 11/23/2022 08:32 AM
Project Title

City Dock Replacement, Boat Ramp Expansion and Repair - 2859-2018-02 - City of McCall

Physical Address View project details and contacts
City, State (County) McCall, ID 83638   (Valley County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $253,705 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Our City docks at Art Roberts and portions of those docks at Legacy Park (boat ramp) are at or nearing the end of their useful life. The sewer pump-out dock has exceeded it's life expectancy and the department was forced to shut down the pump-outs for liability and direct boaters to the private pump-out at May Marina during the summer of 2017. We are currently assessing the need for the public pump-out and its location. In the meantime the dock itself needs to be replaced. Recent plans associated with a Waterways Improvement Fund Grant and County Waterways funding will now increase short term moorage at the ramp through expanded docks systems. We will re-purpose the existing boat launch docks to replace the failing pump out dock. In addition, maintenance and repairs will be done to sub surface boat ramp infrastructure. The project is included in the city's 2023-2027 capital improvement plan (CIP). As of November 23, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents