Similar Projects
Improve Water Treatment Plant Phase 2 (FM)
Renovation
Bidding
$1,000,000 CJ est. value
Fort Meade, SD 57741

WEB Water Treatment Plant Improvements - 2022
Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Aberdeen, SD 57401

Freeland Stewardship IRSC - Black Hills National Forest
Term Contract
Sub-Bidding
Custer, SD 57730

Construction Facility Maintenance IDIQ
Term Contract
Sub-Bidding
$250,000 CJ est. value
Maurine, SD 57626

Lincoln Township - One Inch Base Coarse Gravel, Road Blading, Snow Removal And Weed Mowing
Term Contract
Post-Bid
Aberdeen, SD 57401

2021 Rodent Control Services
Post-Bid
Aberdeen, SD

WWTF Improvements - Phase 1 Golf Course Force Main and WWTF Repairs
Results
$910,000 est. value
Custer, SD

Aberdeen WRF Biosolids Dewatering
Renovation
Results
Aberdeen, SD

Furnishing Pipe, Fittings and Appurtenances for Phase 2 and 3 WWTF (Wastewater Treatment Facilities) Improvements Project
Term Contract
Sub-Bidding
Custer, SD 57730

Pest Management Services
Term Contract
Post-Bid

2021 Hot Springs Wastewater Treatment Facility Digester Cover Replacement
Results
Hot Springs, SD

Pre-Commercial Thinning in Custer State Park
Term Contract
Sub-Bidding
Custer, SD 57730

Summer Cleaning of Yellow Jacket Apartments
Term Contract
Post-Bid
Spearfish, SD 57783

Wastewater Treatment Facility Primary Clarifier No - 2
Renovation
Results
$2,300,000 est. value
Watertown, SD

Snow Removal at the School for the 2022-2023 School Year
Term Contract
Sub-Bidding
Iroquois, SD 57353

Last Updated 08/03/2022 09:31 PM
Project Title

Furnishing Granular Materials for Phase 2 and 3 WWTF (Wastewater Treatment Facilities) Improvements Project

Physical Address View project details and contacts
City, State (County) Custer, SD 57730   (Custer County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Service/Term Contracts, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project shall consist of the following work: Furnishing approximately 11,000 CuYd of clean-graded granular media approved for Submerged Attached Growth Reactor (SAGR) installation. The low responsive bidder must assure compliance with the requirements of Public Law 115-232, Section 889, Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment. Contractors must assure that telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities), and video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities) WILL NOT be supplied for the project. Bidders are NOT required to comply with Title 40 CFR 33 or Executive Order 12138, which concern utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Womens Business Enterprises (WBE), as these provisions do not apply to this contract. Compliance with the American Iron and Steel provision of the Consolidated Appropriations Act of 2014 is NOT required, as it does not apply to this contract. Davis Bacon and Related Acts do NOT apply to this contract. The City of Custer is a municipality in South Dakota and as such is exempt from paying sales tax. Bidders shall not include sales tax with bids. Questions on sales tax, use and/or excise tax should be directed to the South Dakota Department of Revenue at 800-829-9188. Each bid must be accompanied by bid security payable to the Owner for five (5 percent) percent of the total amount of the Bid as a certified or bank check issued by a State or National bank or ten percent (10 percent) as a bidder's bond. The Owner reserves the right to reject any and all bids or to accept any bid. Bidder's Proposal shall hold firm for thirty (30) days from the date of opening. Mutually agreed upon extensions of time may be made, if necessary.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents