Similar Projects
Plumbing, Domestic Water and Light Commercial Heating Systems Service
Term Contract
Post-Bid
Box Elder, Spearfish, SD 57719

Plumbing, Domestic Water and Light Commercial Heating Systems Service
Term Contract
Post-Bid
Box Elder, Spearfish, SD 57719

Rosebud Penthouse Mechanical Work - Construction Project
Term Contract
Results
$100,000 to $250,000 est. value
Rosebud, SD

Basin 21 Sanitary Sewer Improvements
Infrastructure
Results
$460,537 CJ est. value
Sioux Falls, SD 57104

Bid Package BP1-W Plumbing
Alteration
Post-Bid
$100,000 est. value
Kadoka, SD

Wastewater Treatment Facility & North Lift Station Improvements
Renovation
Results
$2,173,885 CJ est. value
Lake Norden, SD 57248

Licensed Plumbing Contractor Services
Term Contract
Post-Bid
Sioux Falls, SD 57104

Kingbrook Rural Water System - De Smet Water Treatment Plant Improvements
Renovation, Infrastructure
Results
$11,814,600 CJ est. value
De Smet, SD 57231

Wounded Knee Community Drinking Water System Upgrades
Infrastructure
Results
$1,082,610 CJ est. value
Pine Ridge, SD 57770

Cresbard Utility Improvements
Infrastructure
Results
$5,146,657 CJ est. value
Cresbard, SD 57435

WWTF Improvements
Infrastructure
Results
$431,157 CJ est. value
Irene, SD 57037

Canton Pump Station Project
New Construction, Infrastructure
Results
$535,493 CJ est. value
Canton, SD 57013

Hill Elevated Tank Project
Infrastructure
Results
$13,028,100 CJ est. value
Canton, SD 57013

Rocky Point Sanitary Lagoon System for Dump and Fish Cleaning Stations (Phase 2)
Infrastructure
Results
$250,586 CJ est. value
Belle Fourche, SD 57717

Saint Joseph Street Valve Repair - West Boulevard to 4th Street
Infrastructure
Results
$759,138 CJ est. value
Rapid City, SD 57701

Last Updated 04/21/2023 06:01 AM
Project Title

Phase Tank Mainline Project

Physical Address View project details and contacts
City, State (County) Toronto, SD 57268   (Deuel County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Bids by Invitation
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $6,795,581 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project shall consist of the following work and approximate quantities and kinds of materials: Construction of approximately 33 miles of 2" to 12" pipeline, mainline valves, directionally drilled crossings, flushing hydrants, and miscellaneous appurtenant work. Contractors resident in South Dakota who intend in good faith to submit a Bid shall be furnished one (1) free paper set of proposed forms, plans, and specifications upon request. All proposals shall be made on forms provided by the Engineer. Each bid must be accompanied by bid security payable to the Owner for five percent (5%) of the total bid as a certified or bank check or ten percent (10%) as a Bid Bond. Bidders will be required to comply with Davis Bacon Wage Rate Requirements. The Owner reserves the right to reject any and all bids or to accept any bid. Contractor's Proposals shall hold firm for thirty (30) days from the date of opening. Mutually agreed upon extensions of time may be made, if necessary. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to June 2023.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents