Similar Projects
Tuskegee University - Design/Build Project ADA Parking
Renovation
Bidding
Tuskegee, AL 36083

Constructing the Pedestrian and Streetscape Improvements (Grading, Drainage, Hardscaping, Sidewalk Installations, and Landscaping) Underneath the I-20/I-59 CBD Bridge in Birmingham
Bidding
$27,418,748 to $33,511,803 est. value
Birmingham, AL

Gibbs Village East and West Erosion Control/Sidewalk Improvements
Post-Bid
Montgomery, AL

Sidewalks along Pryor Street and U.S. Highway 31
Post-Bid
$400,000 to $600,000 est. value
Athens, AL 35611

2018 CDBG Sidewalk Project Alexander Drive Extension
Results
Dothan, AL

Sidewalk Replacement at Martin and Mcgee Hall Jacksonville State University
Results
Less than $142,466 est. value
Jacksonville, AL 36265

Campus Parking Expansion Phase 1 - West Campus and Hay Fields
Bidding
Auburn, AL

Renovation and ADA Upgrades to Clayton Park for the City of Citronelle
Renovation
Post-Bid
Citronelle, AL 36522

New County Road 13 Sidewalks - Sedgefield to Manley Road Soccer Complex
Results
$480,000 to $520,000 est. value
Fairhope, AL

Bidder Pre-Qualifications - AltaPointe Health Systems Inc.
New Construction
Bidding
Mobile, AL 36608

Traffic Safety Improvements 2019
Post-Bid
Mobile, AL 36633

Pedestrian Sidewalks in Central Business District
Results
Less than $174,475 est. value
Fairhope, AL

James L. Dawson Cooperative Building Parking Lot
Post-Bid
Normal, AL 35762

Sidewalk Improvements Phase 3, Grids 14, 18, 19, 20, 26, 27 and 28
Results
Jacksonville, AL 36265

Sidewalks Along Various Streets
Post-Bid
Decatur, AL 35601

Reported 04/16/2021 12:00 AM
Project Title

Arab High School Parking Lot Expansion

Physical Address View project details and contacts
City, State (County) Arab, AL 35016   (Marshall County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to, site prep, grading, new construction of a parking lot expansion for Arab High School, including concrete, asphalt, coordination of the Work of the project, and all related work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents