Similar Projects
Widen I-71 From Four to Six Lanes From KY-393
Infrastructure
Conception
$40,000,000 CJ est. value
Crestwood, KY 40014

Widen I-71 From Four to Six Lanes From KY-393
Infrastructure
Conception
$40,000,000 CJ est. value
Crestwood, KY 40014

Install Guardrail on KY-522 in Harlan County
Infrastructure
Conception
$634,000 CJ est. value
Totz, KY 40870

Old Schoolhouse Lane Subdivision
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Lexington, KY 40513

Reconstruct Between KY 120 and RR Bridge
Infrastructure
Conception
$1,360,000 CJ est. value
Slaughters, KY 42456

Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Address Pavement Condition of PCC Pavement on I-24 Both Direction(S)
Infrastructure
Conception
$6,500,000 CJ est. value
Hopkinsville, KY 42240

Address Pavement Condition of I-75 Non-Cardinal Direction(S)
Infrastructure
Conception
$1,250,000 CJ est. value
Williamstown, KY 41097

Improve KY-207 From the Industrial Parkway to the KY-693 Intersection
Infrastructure
Conception
$32,900,000 CJ est. value
Flatwoods, KY 41139

Address Pavement Condition of Julian M. Carroll Purchase Parkway Both Direction(S)
Infrastructure
Conception
$1,750,000 CJ est. value
Fulton, KY 42041

Improve Safety, Congestion, and Pedestrian and Freight Mobility on US 42
Infrastructure
Conception
$7,880,000 CJ est. value
Warsaw, KY 41095

Improve Safety and Reduce Congestion on KY-536 From Williamswood Road/ Calvary Drive to KY-17
Infrastructure
Conception
$23,790,000 CJ est. value
Independence, KY 41051

Expand/Improve TH Morgan Building - University of Kentucky
Addition, Demolition, Renovation, Infrastructure
Conception
$60,000,000 CJ est. value
Lexington, KY 40508

Improve Whalen Building - University of Kentucky
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
Lexington, KY 40508

Construct Greenhouse Complex - University of Kentucky
New Construction, Infrastructure
Conception
$21,000,000 CJ est. value
Lexington, KY 40508

Last Updated 02/24/2023 03:23 PM
Project Title

Cleveland Drive Extension

Physical Address View project details and contacts
City, State (County) Paris, KY 40361   (Bourbon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The U.S. Department of Commerce Economic Development Administration is providing partial funding for this project (EDA Investment No. 04-79-07603) The work to be bid upon is described as follows: Cleveland Drive Extension o Approximately 13,000 CY of Excavation o Approximately 5,000 Tons of Asphalt Paving o Associated Curb, Gutters, and Storm Sewer o Approximately 1,600 LF of Sanitary Sewer Main Extension o Approximately 2,700 LF of 12-inch Ductile Iron Water Main Extension o Other necessary items as shown on Drawings and Specifications. After award of a contract, the General Contractor will be furnished, without charge, a reasonable number of plans and specifications needed to prosecute the work. Subcontractors and manufacturers and suppliers shall obtain plans and specifications from the General Contractor. Sealed proposals for the Contract shall be clearly marked on the outside of the container as follows: "Sealed proposal for Cleveland Drive Extension" Not to be opened until February 17th, 2023 If forwarded by mail, the sealed envelope containing the proposal must be enclosed in another envelope and mailed to the Paris-Bourbon EDA ATTN: Gordon Wilson, 525 High Street, Paris, KY 40361 allowing sufficient time for such mailing to reach this address prior to the scheduled closing time for the receipt of proposals Bids shall be accompanied by a certified check or bid bond payable to the Paris Bourbon County EDA in an amount not less than five percent (15%) of the base bid. No bidder may withdraw his bid for a period of ninety (90) days after the date bids are opened. He may, however, withdraw his bid at any time prior to the time and date scheduled for opening of same or any authorized postponement thereof. Any bid received after the time and date specified will not be considered and will be returned unopened to the bidder The Paris-Bourbon EDA reserves the right to reject any and all bids and to waive formalities and any bid that is obviously unbalanced may be rejected.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents