Similar Projects
Roll-Em-Up Taquitos
New Construction - 1,700 SF
Conception
$500,000 to $1,000,000 CJ est. value
Tulsa, OK

Nashbird Chicken Restaurant
New Construction - 2,550 SF
Conception
$500,000 to $1,000,000 CJ est. value
Tulsa, OK

Wendy's at The Village at Stone Wood Hills
New Construction - 3,500 SF
Design
Broken Arrow, OK 74012

Coffee Shop and Bakery
New Construction, Renovation - 7,357 SF
Design
Tulsa, OK 74106

Sonic 3055
Renovation - 1,479 SF
Post-Bid
Tulsa, OK 74136

Cafeteria Improvements at Edison Preparatory
Renovation
Post-Bid
$2,500,000 est. value
Tulsa, OK

Vision 2025: Development of a Mixed Use Route 66 Project
New Construction
Results
Tulsa, OK 74127

Arby's
Renovation
Construction
Tulsa, OK 74115

Arby's
Renovation - 2,200 SF
Construction
Tulsa, OK 74137

North of Market ( NOMA) - Mixed Use Development
New Construction, Demolition - 463,381 SF
Pending Verification
$60,000,000 est. value
Tulsa, OK 74129

Dunkin Donuts
New Construction
Design
Tulsa, OK 74127

Mod Pizza
Build-Out - 3,200 SF
Post-Bid
Broken Arrow, OK 74012

Arby's
Renovation - 3,145 SF
Construction
$150,000 est. value
Tulsa, OK

Peabody's Bar
Renovation - 2,140 SF
Design
$366,962 est. value
Tulsa, OK 74133

Chipotle Mexican Grill
New Construction - 2,325 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Owasso, OK 74055

Reported 06/28/2022 08:54 AM
Project Title

Church's Chicken - South Lewis Avenue / Tulsa

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74105   (Tulsa County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $357,281 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for converting an Arby's into a Church's Chicken. As of June 27, 2022, this project has obtained building permits. Information regarding the selection of a general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the third quarter 2022.

Details

Food/Beverage Service, 1 Story Above Grade, Approximately 2,452 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Walk-In Freezers, Foodservice Shelving, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Bar Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Commercial Dishwashers.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents