Similar Projects
Turf Removal Project A - Anthem Hills Park and Hayley Hendricks Park
Infrastructure
Design
Henderson, NV 89015

Countywide - Emergency Generator & Automatic Transfer Switch Replacement
Renovation
Sub-Bidding
$3,600,000 CJ est. value
Las Vegas, NV 89106

Contract for Purchase & Install of LED Electrical Lights Countywide
Infrastructure
Sub-Bidding
$4,000,000 CJ est. value
Las Vegas, NV 89101

Mead Breaker Mechanism Replacement
Term Contract
Post-Bid
Boulder City, NV 89005

GC Construction Services - Energy Upgrades
Alteration
Post-Bid
Las Vegas, NV

HVAC and Electrical System Upgrade Edward A. Greer Education Center
Alteration
Results
$520,000 est. value
NV

Purchase and Install Transformer
Term Contract
Results
Reno, NV 89502

Feeder 53 Replacement
Infrastructure
Post-Bid
$3,000,000 to $3,500,000 est. value
Boulder City, NV

Replace High Mast Lighting, High Desert State Prison Project
Alteration
Results
$1,389,203 est. value
Indian Springs, NV 89070

Electrical Support Services
Term Contract
Post-Bid
Boulder City, NV

Big Bend Raw Water ICCP System Replacement
Renovation, Infrastructure
Results
$160,000 est. value
Laughlin, NV 89029

3-Phase Padmount Transformer
Term Contract
Post-Bid
Nellis Air Force Base, NV

Lighting Equipment - Judy Bayley Theatre
Term Contract
Results
Las Vegas, NV 89154

Phoenix Area Facilities Technical Specialist Services
Term Contract
Post-Bid
Phoenix, AZ - Winterhaven, CA

Remove and Replace High Mast HPS Fixtures With LED
Alteration
Results
$1,850,000 to $2,200,000 est. value
NV

Last Updated 06/27/2023 11:31 AM
Project Title

Russell Campus, Building and Fire Prevention: Lighting Control System Replacement

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89118   (Clark County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,155,712 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 27, 2023, bids were canceled. No definite date for the rebid.** As of December 20,2022, bids received were rejected. No definite date for the rebid. RP A0321107 Russell Campus Building and Fire Prevention Lighting Control System Replacement A requirement of the contract includes a certification that Bidder is not currently engaged in, and agrees for the duration of the contract not to engage in, a boycott of Israel. The Work consists of the construction of replacement of existing lighting control system with new lighting control panels, lighting control devices and lighting control cabling throughout the entire building including the installation and installation of 2nd floor new light fixtures and associated supporting cables and power accessories, Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: Scope 1 - All demolition and repair Work as noted by divisions 02, 09 and 26. Demolition of the lighting control equipment including the lighting relay panels, lighting control devices and existing lighting control cabling plus the demolition of 2nd floor light fixtures and associated supporting cables and power accessories. Scope 2 - Installation of new lighting control panels, lighting control devices and lighting control cabling throughout the entire building plus the installation of the new 2nd floor light fixtures, associated supporting cables and power accessories. Commissioning of the lighting control panels connection to the building management system and the commissioning/programming of the lighting analytics system. Power connections for a complete system including conduit, boxes and conductors to support the new equipment. Connection of the lighting control panels and analytics system to the building LAN/WAN system. Repairing and painting/patching of all ceilings and walls and replacement of damaged ceiling tiles shall be completed to repair the existing spaces back to their original condition. Material storage shall be limited to on site storage containers, provided by the contractor and coordinated with the engineer/RPM D&C. Work hours: The General Contractor will perform construction activities during the following times: Sunday through Saturday 6:30 PM to 5:30 AM. All dates and times will be outlined in the project schedule as required per Section 01 32 16. The Contractor will notify the Owner's Representative when changes to the submitted working days/hours are deemed necessary *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents