Similar Projects
Mercury Street Improvements Project
Infrastructure
Post-Bid
Butte, MT 59701

Rehabilitation of the Existing Wastewater Collection
Infrastructure
Results
MT

Dena Mora Rest Area Rehabilitation
Infrastructure
Results
MT 59830

2022 Sewer Lining Project
Infrastructure
Post-Bid
Bozeman, MT

Big Sandy Stormwater Improvements
Infrastructure
Post-Bid
Big Sandy, MT 59520

CCTV City Storm Drain
Infrastructure
Post-Bid
Billings, MT

Wyoming Street Storm Sewer Improvement Project
Infrastructure
Results
$600,000 est. value
Kalispell, MT

RFP D/B - Bridger Creek Flood and Erosion Control Project
Infrastructure
Post-Bid
$250,000 CJ est. value
Bozeman, MT 59715

Davis-fowler Interceptor (Durston Road to West Oak Street) - WWIF22 - City of Bozeman
Infrastructure
Conception
$1,250,000 est. value
Bozeman, MT

Bogert Place - Church to Story Street - SCR26 - City of Bozeman
Infrastructure
Conception
$402,000 est. value
Bozeman, MT 59715

Missouri River North Bank Stabilization Phase I
Infrastructure
Post-Bid
$600,000 CJ est. value
Great Falls, MT 59401

Last Updated 08/29/2022 04:37 PM
Project Title

Fox Reservoir #1 Replacement - City of Billings

Physical Address View project details and contacts
City, State (County) Billings, MT 59111   (Yellowstone County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids
Project Status Construction start expected June 2028
Bids Due View project details and contacts
Estimated Value $3,250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace the existing reservoir. The existing steel reservoir was constructed in 1982. The interior paint has reached the end of its lifecycle and is required to be recoated. Rather than recoat the reservoir, the life cycle costs are less to replace the reservoir with a concrete reservoir. Failure to complete this project will require that the existing reservoir be recoated and long term increase in costs. The project is included in the city's 2023-2027 Capital Improvement Program (CIP). As of August 29, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents