Similar Projects
Kansas University West Campus Mixed Use Development
New Construction
Conception
Lawrence, KS 66044

Overland Park Arboretum Nature Trail - City of Overland Park
Infrastructure
Conception
$3,050,000 est. value
Bucyrus, KS 66013

Ridgeview Corporate Centre
New Construction
Design
Lawrence, KS

Renner 87 Flats
New Construction
Design
Lenexa, KS

RFP D/B - Federal Correctional Institute (FCI) - City of Leavenworth
New Construction, Infrastructure
Bidding
$300,000,000 CJ est. value
Leavenworth, KS 66048

OS 95 Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$316,300 CJ est. value
Lincoln, KS 67455

The Hudson - Apartments and Parking Garage
New Construction, Infrastructure - 664,000 SF
Sub-Bidding
$50,000,000 CJ est. value
Kansas City, KS 66103

The Hudson - Apartments and Parking Garage
New Construction, Infrastructure - 664,000 SF
Sub-Bidding
$50,000,000 CJ est. value
Kansas City, KS 66103

Turner`S Logistic Center West
New Construction
Post-Bid
Kansas City, KS

Elevator Modernization at Bethany Park Towers
Renovation
Post-Bid
Kansas City, KS 66102

Boring Marsh of The Swans Water Supply Line
Term Contract
Results
Melvern, KS 66510

Farmers' Market Pavilion Site
Infrastructure
Results
Overland Park, KS

The Chadwick
New Construction - 317,744 SF
Construction
$90,200,000 est. value
Shawnee, KS 66214

Brookridge Mixed Use Development
New Construction
Pending Verification
Overland Park, KS

Watercrest Mix-Use Development
New Construction
Pending Verification
Lenexa, KS 66250

Last Updated 07/29/2022 12:11 PM
Project Title

Andover Apartments

Physical Address View project details and contacts
City, State (County) Andover, KS 67002   (Butler County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method General Contractor Bidder To Subcontract, Bids by Invitation
Project Status Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

New apartment building complex. Consists of 5 each 3 story apartment buildings (120 total units and 45,950 SF total); 5 each 3 story apartment buildings (120 total units and 43,190 SF total); 1 single story clubhouse approximately 5,000 SF; and 5 each parking garages totaling 18,500 SF. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff.

Details

5 Apartments/Condominiums, 3 Stories Above Grade, 45,950 SF New Construction, 120 Unit(s), Clubhouse/Social Club, 5,000 SF New Construction, 5 Parking Garage, 18,500 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents