Similar Projects
Camp Davis North Runway Erosion Repair
Design
Camp Lejeune, NC 28547

Headwall
Bidding
Jacksonville, NC 28540

18" N-12 HDPE IB/WT Double Wall
Post-Bid
Jacksonville, NC 28541

18" N-12 HDPE IB/WT Double Wall 20"
Post-Bid
Jacksonville, NC

North Academic Drive Renovation Project
Results
Less than $1,808,000 est. value
NC

US 17 Bore and Jack
Results
NC

Erosion Control Material - FY20-21
Term Contract
Post-Bid
Jacksonville, NC 28540

Elliptical Pipe Aluminum
Results
Jacksonville, NC

Northwest Regional Water Reclamation Facility Hurricane Florence Response Flood Mitigation Measures
Post-Bid
Jacksonville, NC

Headwall
Results
Jacksonville, NC 28540

Aluminum Box Culvert
Results
Jacksonville, NC 28540

N-12 HDPE IB/WT Double Wall N-12-FY21
Results
Less than $1,809 est. value
Jacksonville, NC

Georgetown Driveway Drainage Improvements
Results
Less than $8,410 est. value
Jacksonville, NC 28541

N-12 HDPE IB/WT Double Wall N-12/Corrugated Aluminum Pipe
Results
Jacksonville, NC 28541

Watershed Restoration Project - Phase 2
Results
Less than $89,396 est. value
Jacksonville, NC

Last Updated 11/17/2020 10:10 AM
Project Title

New Bridge Street Outfall

Physical Address View project details and contacts
City, State (County) Jacksonville, NC 28541   (Onslow County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing 30” and 36” Reinforced Concrete Pipes (RCPs) between New Bridge Street and College Street that drains the existing New Bridge Street Phase 1 storm drainage system and replace with ~225 LF of 42” RCP , ~200 LF of 48” RCP and ~52 LF of 54" RCP. The replacement pipe system will match the alignment described within Alternative 4 in the “New Bridge Street Stormwater Optimization Study – Phase 1 and 2 Technical Memorandum”. It is expected that this replacement pipe system will tie into the proposed New Bridge Street Phase 1 drainage system and new downstream storm system on Warlick Street.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents