Similar Projects
CDC Playground Shade Fabric Replacement
Results
Clovis, NM 88101

Pajarito Complex Exterior Wall Replacement Project
Results
Los Alamos, NM 87544

YDI Turf Replacement
Post-Bid
Albuquerque, NM

Job Order Contracting (JOC) - Painting + Stucco
Post-Bid
Albuquerque, NM 87109

Exterior Repair for Public Rental Units
Post-Bid
Nageezi, NM

NMHU Stucco Project
Results
Las Vegas, NM

Dexter Furnish and Install Pond Liner
Results
$110,000 to $114,000 est. value
Roswell, NM

NNMNWRC Stucco Repair and Paint 2019
Results
$25,000 to $100,000 est. value
NM

54--Camino Real - Shade Shelters
Results
Las Cruces, NM

Exterior Repair for Public Rental Units
Post-Bid
Crownpoint, NM

Casino Wallpaper Removal and Installation
Post-Bid
Albuquerque, NM 87113

Reported 02/22/2020 12:00 AM
Project Title

Repair Facility Exterior Main Base

Physical Address View project details and contacts
City, State (County) Alamogordo, NM 88310   (Otero County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: 8(a) Set-Aside (FAR 19.8). The Contractor shall provide all materials, equipment and labor necessary to repair roofs on Building - 121, 165 Arkansas Avenue and Building - 193, 830 Ocotillo Avenue and Building 296, 700 Delaware Avenue and Building – 310, 280 Delaware Avenue and Building – 317, 744 Delaware Avenue Holloman AFB, NM. The existing facilities are currently occupied. See associated drawing plans/as-builds for additional information. Field verify ALL existing conditions. All renovation and repair and alterations and demolition work must be fully coordinated with the users in each Building. All work inside occupied spaces within buildings must be fully coordinated with the user. ALL new work shall be phased and executed to allow continued use of the buildings so as to minimize impact to the building’s mission.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents