Similar Projects
Buchman Subdivision
New Construction
Conception
Marlboro, NJ 07751

Wall Speedway Housing
New Construction, Demolition
Conception
Wall, NJ 07719

Crine Realty Subdivision
New Construction
Design
Marlboro, NJ 07751

Four Seasons at Colts Farm
New Construction - 3,900 SF
Design
Howell, NJ

Housing Rehabilitation
Renovation
Bidding
Toms River, NJ 08756

Rehabilitation of the Residential Properties 1) 256 Fort DeFrance Avenue 2) 162 Bonaire Drive 3) 77 Scarborough Place - Berkeley Township
Post-Bid
Brick, NJ 08723

Furnishing of Phase II Demolition Work and Site Restoration
Demolition
Post-Bid
NJ

Housing Rehabilitation Services
Renovation
Results
Long Branch, NJ 07740

P--Demolition, Disposal, and Asbestos Abatement of Rail Boxcars.
Results
Colts Neck, NJ 07722

South Beach at Long Branch Condominiums
New Construction, Demolition - 100,000 SF
Construction
$50,000,000 est. value
Long Branch, NJ 07740

Oak Hallow at Middletown
New Construction, Demolition - 21,600 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Middletown, NJ 07748

Hickory Lane Homes
New Construction
Pending Verification
Bayville, NJ 08721

Hooper Avenue Development
New Construction
Pending Verification
NJ 08723

Cheder Bnai Torah School Addition
New Construction, Addition
Conception
Lakewood, NJ 08701

Jackson Parke Phases I-V
New Construction - 6,137 SF
Design
Jackson, NJ 08527

Last Updated 04/27/2021 11:23 AM
Project Title

Demolition of Residential Properties

Physical Address View project details and contacts
City, State (County) Jackson Township, Neptune, Tuckerton, NJ 08527 (Monmouth, Ocean Counties)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Demolition, Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work shall include: the demolition of three abandoned residential buildings including vermin control, soil erosion controls, site protection, building demolition, all foundation removal, demolition of site improvements, excavation, backfilling and grading, removal and disposal of site demolition debris, ACM abatement where required, the termination of removal of water and sewer services; all building materials, well/septic abandonment, and all else required.

Details

3 Single-Family Homes, Demolition.
Division 02 - Existing Conditions, Demolition.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents