Similar Projects
Muskegon Museum of Art Expansion
Addition, Demolition, Renovation, Infrastructure
Design
$11,200,000 CJ est. value
Muskegon, MI 49440

Installation of Wireless Vehicle Detection System, Curb Ramps and Pavement Markings on Henry Street
Infrastructure
Bidding
$200,000 CJ est. value
Norton Shores, MI 49441

Installation of Wireless Vehicle Detection System, Curb Ramps and Pavement Markings on Henry Street
Infrastructure
Bidding
$200,000 CJ est. value
Norton Shores, MI 49441

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Water System Improvements Muskegon County Channel Crossing Contract No 2
Results
Muskegon, MI

Adelaide Pointe Condos / Muskegon
New Construction, Infrastructure
Pending Verification
$250,000,000 CJ est. value
Muskegon, MI 49440

Adelaide Pointe Condos / Muskegon
New Construction, Infrastructure
Pending Verification
$250,000,000 CJ est. value
Muskegon, MI 49440

RFQ Engineering - Lake Harbor Pathway Engineering Services
Infrastructure
Bidding
$400,000 CJ est. value
Norton Shores, MI 49441

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

0.30 MI of Hot Mix Asphalt Reconstruction, Concrete Curb, Gutter
Results
Montague, MI

Adelaide Pointe Hotel / Muskegon
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Muskegon, MI 49441

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Campbell Field - Site Preparation
Results
Muskegon, MI

Last Updated 09/23/2022 10:11 AM
Project Title

Wastewater and Water System Improvements Sanford Street - Laketon to Apple

Physical Address View project details and contacts
City, State (County) Muskegon, MI 49441   (Muskegon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $4,907,095 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September, 23. 2022, project was awarded to Kamminga & Roodvoets. awarded amount is $4,907,094.50.** The project consists of furnishing all material and constructing the following approximate quantities: o 5,770 ft. of 8-inch sanitary sewer o 3,460 ft. of 12-inch to 36-inch storm sewer o 1,945 ft. of 4-inch to 16-inch water main o 5,700 ft. of road reconstruction Including all necessary appurtenances and restoration. The work to be performed under this contract will be financed and paid for by funds received from by the Michigan Department of Environment, Great Lakes, and Energy (EGLE) State Revolving Fund (SRF), the EGLE Drinking Water Revolving Fund (DWRF) and with City of Muskegon local funds. SRF and DWRF monies will be received by the City of Muskegon. Davis-Bacon/Prevailing Federal Wages apply to this project. Federal Labor Standards Provisions and associated documents that are incorporated in this contract are included in Appendix A. The SRF Project Number is 5767-01. The DWRF Project Number is 7566-01. The Contractor will be required to comply with the debarment and American Iron and Steel contractual language included in Appendix A. A bid bond, certified check, or cashier's check payable to City of Muskegon in an amount equal to five percent (5%) of the total price shall accompany each bid. This surety shall bind the bidder for a period of one hundred twenty (120) days after the receipt of bids. Attendance at the bidders information meeting is mandatory for all General Contractors wishing to submit a bid on the projects. Minutes of the bidders information meeting will be forwarded to all plan holders as an addendum. This pre-bid meeting will provide information for both SRF/DWRF funded projects being bid out by the City of Muskegon. The pre-bid meeting will follow the following agenda (all times after 2:00 PM are subject to change): 2:00 - General SRF/DWRF Project requirements (applies to both contracts) 2:15 - Sanford Street: Laketon to Apple 2:45 - Water Service Contract All work shall be substantially completed (Roads open to traffic) on September 29, 2023. Final restoration and project completion shall occur on or before November 3, 2023. See agreement for specific milestone requirements.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents