Similar Projects
1130 North Drainage Improvements - City of Saint George
Infrastructure
Conception
$1,400,000 CJ est. value
St George, UT 84770

Bloomington Pickleball Courts - City of Saint George
Infrastructure
Conception
$1,174,041 CJ est. value
St George, UT 84790

Monopole Tower
New Construction, Infrastructure - 100 SF
Design
$53,700 CJ est. value
St George, UT 84770

3000 East Widening - 1580 South To Seeg Drive - City of Saint George
Infrastructure
Design
$13,100,000 CJ est. value
St George, UT 84790

Fossil Falls Park
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
St George, UT 84790

Foundation Construction - Gap Canyon Pkwy Transmission Line
Infrastructure
Bidding
$7,000,000 CJ est. value
St George, UT 84770

Cultural and Environmental MATOC
Term Contract
Post-Bid

Sky Mountain Power Substation Grading and Utilities
Infrastructure
Post-Bid
Hurricane, UT

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

CDBG PY21 FY22 Clearance 100 West
Term Contract
Results
Saint George, UT 84770

Black Desert Resort
New Construction
Construction
Ivins, UT

Zion Guru
New Construction, Infrastructure - 3,416 SF
Pending Verification
$900,000 CJ est. value
Springdale, UT 84767

Steward Health Care Hospital
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Washington, UT 84780

Riverside Drive Sewer Main Replacement R 11 Reach 1 - 62-6200-7970 - City of Saint George
Infrastructure
Conception
$3,500,000 CJ est. value
St George, UT 84790

Peregrine Point West - Phase 1
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Hurricane, UT 84737

Last Updated 12/07/2022 10:25 AM
Project Title

Bloomington Hills Berm Project

Physical Address View project details and contacts
City, State (County) St George, UT 84790   (Washington County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $85,657 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The BID includes the following: labor, equipment and materials to construction the Bloomington Hills Berm Project which includes, excavation and compaction, geotextile fabric and riprap placement, and miscellaneous irrigation line improvements. All BIDDERS who submit a BID are required to be on the Plan Holders List. Addenda will only be provided to the plan holders that are on the Plan Holders List. The 100% performance - labor and materials bond will be required on this project. Every BID shall be accompanied by a bid bond in the amount of 5% of the BID, naming the City of St. George as obligee, this bid bond must be issued by a surety company licensed to do business in the State of Utah and be on a bond form acceptable to the City of St. George. As required by St. George City Code 1-10B-14 a signed certificate of legal work status for the BIDDER must accompany the BID. City of St. George reserves the right to reject any, or all BIDS, or to waive any formality or technicality in any BID, in the interest of the city.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents