Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Bloomington Pickleball Courts - City of Saint George
Infrastructure
Conception
$1,174,041 CJ est. value
St George, UT 84790

The Cove at Desert Color
New Construction, Infrastructure - 29,271 SF
Design
$6,800,000 CJ est. value
St George, UT 84790

Springdale Wastewater Lagoon Improvements Headworks Powered Screen
Infrastructure
Bidding
$700,000 CJ est. value
Springdale, UT 84767

RFP Construction Manager - New Washington County Purgatory Medical Unit, Housing Expansion, With Booking/Release Remodel
Addition, Demolition, New Construction, Build-out, Infrastructure
Bidding
$14,500,000 CJ est. value
Hurricane, UT 84737

Springdale Wastewater Lagoon Improvements Sand Filtration
Renovation, Infrastructure
Sub-Bidding
$600,000 CJ est. value
Springdale, UT 84767

River Bottom Improvement Project Prequalification
Post-Bid

Remodel of the Structure at 680 Zion Park Boulevard
Post-Bid
Springdale, UT 84767

Advanced Metering Infrastructure
Results
Virgin, UT

Construction of the Washington City Highlands Water System
Infrastructure
Results
Washington, UT 84780

Black Desert Resort
New Construction
Construction
Ivins, UT

Bench Lake Townhomes
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Hurricane, UT 84737

Zion Regional Medical Center
New Construction, Infrastructure - 85,000 SF
Pending Verification
$50,000,000 CJ est. value
St George, UT 84790

Riverside Drive Sewer Main Replacement R 11 Reach 1 - 62-6200-7970 - City of Saint George
Infrastructure
Conception
$3,500,000 CJ est. value
St George, UT 84790

Ash Creek Pipeline Project - Phase 1
Infrastructure
Bidding
$200,000 CJ est. value
St George, UT 84770

Last Updated 08/10/2022 03:38 PM
Project Title

1130 North Drainage Improvements - City of Saint George

Physical Address View project details and contacts
City, State (County) St George, UT 84770   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A full scope has not been determined The project is included in the city's 2023-2027 Capital Improvement Program (CIP). As of August 10, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents