Similar Projects
Red Sky Ranch
New Construction
Conception
Norman, OK 73072

The Lakes At Rabbit Run - Phase I
New Construction
Design
Broken Arrow, OK 74011

Cordillera Ranch
New Construction
Design
$32,000,000 est. value
Oklahoma City, OK 73141

Housing Rehabilitation Repairs - Cherokee County
Renovation
Bidding
$40,000 CJ est. value
Fort Gibson, OK 74434

Manufactured Housing Replacement - CDBG
Renovation
Bidding
$150,000 CJ est. value
Edmond, OK 73034

Fire Restoration of Unit #1703, located in Fairview Village
Renovation
Post-Bid
Elk City, OK

Construction of Fifteen 15 Homes on Dev2021 Project
New Construction
Post-Bid
Carter, OK 73627

Housing Rehabilitation Program
Renovation
Results
Muskogee, OK

Ozark Plateau NWR Looney Cabin Renovation Colcord
Renovation
Results
$150,000 to $200,000 est. value
Colcord, OK 74338

Twin Lakes Estates
New Construction
Construction
Noble, OK 73068

Gabe's Crossing
New Construction
Construction
Mustang, OK 73064

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

Village At 1Eleven
New Construction
Pending Verification
Broken Arrow, OK 74011

Housing Rehabilitation Repairs - Delaware County
Renovation
Design
$30,000 CJ est. value
Jay, OK 74346

East Side Housing Renovation
Renovation
Bidding
$30,000 CJ est. value
Broken Bow, OK 74728

Last Updated 08/22/2022 07:33 PM
Project Title

Housing Rehabilitation Repairs - Adair County

Physical Address View project details and contacts
City, State (County) Stilwell, OK 74960   (Adair County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Housing Authority of the Cherokee Nation is seeking bids from interested parties for the rehabilitation of one home located in Adair County. The home has tested positive for ACM. Please adhere to safe work practices for the areas noted in the attached ACM Report. Work will be completed according to the work write-up. This job must be completed in 10 working days. Work should begin within one week of notification or $100.00 will be charged for liquidated damages to the contractor for each working day of extension over the contract end date. To be considered a responsive/responsible bidder, the Mandatory Bid Response sheet and the Work Write Up must be fully completed. To receive preference, bidder must be TERO certified through the Cherokee Nation Tribal Employment Rights Office; proof of certification must accompany submittals. Successful bidder will be obligated to comply with Tribal rules and regulations and TERO. Liquidate damages : 100$

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents