Similar Projects
Sycamore Road Self-Storage Facility
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Dekalb, IL 60115

2024 Bond - Central School District 301
New Construction, Infrastructure, Renovation
Conception
$195,000,000 CJ est. value
Sycamore, IL 60178

First United Methodist Church
New Construction, Infrastructure - 10,986 SF
Design
$600,000 CJ est. value
Dekalb, IL 60115

Kraft Heinz Distribution Center at Chicago West Business Center
New Construction, Infrastructure - 775,000 SF
Design
$400,000,000 CJ est. value
Dekalb, IL 60115

2023 Genoa Downtown Streetscape Project
Infrastructure
Bidding
$900,000 CJ est. value
Genoa, IL 60135

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Milling and Resurfacing on IL 38. Some ADA Work and Traffic Signal Improvements Are Proposed
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Dekalb, IL 60115

2022 Streets Program Bid Package 2
Infrastructure
Results
$814,931 CJ est. value
Dekalb, IL 60115

2022 Streets Program Bid Package 4
Infrastructure
Results
$499,071 CJ est. value
Dekalb, IL 60115

Construct Northern Illinois Center for Community Sustainability - Northern Illinois University
New Construction, Infrastructure - 30,000 SF
Pending Verification
$24,000,000 CJ est. value
Dekalb, IL 60115

McDonald's Remodel / DeKalb
Infrastructure, Build-out
Pending Verification
$1,000,000 CJ est. value
Dekalb, IL 60115

Excavation and Concrete 105 Dutch Street
Infrastructure
Post-Bid
$758,000 CJ est. value
Sandwich, IL 60548

Hot-mix Asphalt Milling
Infrastructure
Results
$67,138 CJ est. value
Shabbona, IL 60550

Lacey's Place
New Construction, Renovation, Infrastructure - 2,000 SF
Pending Verification
$300,000 CJ est. value
Dekalb, IL 60115

2022 Microsurface Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Sycamore, IL 60178

Last Updated 10/16/2023 11:32 AM
Project Title

New Maintenance Grounds Building at Huntley Middle School

Physical Address View project details and contacts
City, State (County) Dekalb, IL 60115   (DeKalb County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,273,400 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 16, 2023, this project has not yet been awarded. A timeline for award has not yet been established. New Maintenance Grounds Building at Huntley Middle School DeKalb CUSD #428 DeKalb, Illinois 60115 LOCATIONS: Huntley Middle School 1515 South 4th Street DeKalb, Illinois 60115 Bids will be received for the New Maintenance Grounds Building. Bidding Documents are on file for reference at the following locations: Office of the Architect Rockford, IL NIBCA (N. Ill. Bldg. Contractors Assn) Rockford, IL Bids shall be submitted in duplicate on forms issued by Architect. Bids shall be accompanied by a Bid Security of at least 10% of the total amount of the base bid and all additive alternate bids. This may be in the form of a certified check, cashier's check, bank draft or bid bond, payable to the Owner as a guarantee that should the bidder be awarded the Work, the bidder will enter into a contract with the Owner and will furnish the proper performance and payment bond within the time limit set by the Owner. Bid securities will be returned to all other bidders when the successful bidder files a proper performance and payment bond and the contract is executed by the Owner. If the successful bidder fails to file such contract and performance and payment bond, the amount of his bid security shall be forfeited to the Owner as liquidated damages. Each craft, type of worker and mechanic needed to execute the Contract shall be paid the prevailing wage rate for the locality in which the work is performed, in accordance with all federal laws and laws of the State as well as local ordinances and regulations applicable to the work hereunder and having force of law. A performance and payment bond for the full amount of the Contract will be required of the successful bidder. All costs associated with the bond shall be included in the bid amount. The Owner reserves the right to waive any irregularities and/or reject any or all bids when, in the opinion of the Owner, such action will serve the best interests of the Owner. No bid may be withdrawn for a period of 60 days after the opening of bids without written consent of the Owner. All Work shall be substantially complete by 5:00 pm July 26, 2023. If work is not substantiall Notice Authentication Number: 202308221929588929673 1805527352

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents