Similar Projects
Hubbard High School Floor Tile
Alteration
Bidding
$30,000 est. value
Chicago, IL 60629

Kinzie Floor Tile Installation
Alteration
Bidding
$30,000 est. value
Chicago, IL

Common Area Carpet
Post-Bid
Alsip, IL

Carpet
Post-Bid
Palatine, IL

CPS Otis ES Hallway Tile Replacement
Term Contract
Results
Chicago, IL 60642

Des Plaines Boardroom Expansion/Renovation Athletic/Theater Wing Flooring Replacement
Term Contract
Results
Arlington Heights, IL

Bogan High School Floor Tile Installation
Alteration
Bidding
$40,000 est. value
Chicago, IL 60652

2021 Flooring Replacement
Post-Bid
Park Ridge, IL 60068

N072--Removal and Replacement of Existing Flooring
Term Contract
Results
Chicago, IL 60612

2021 Flooring Renovations
Post-Bid
Matteson, IL 60443

Hay ES Gym Floor
Alteration
Results
Chicago, IL 60651

ACM Removal
Post-Bid
Palos Hills, IL 60465

Cather ES Asbestos Abatement and Flooring Replacement
Alteration
Results
Chicago, IL

Administration Building Flooring
Post-Bid
Riverside, IL

Gym Floor and Bleacher Replacement
Renovation, Alteration
Results
Streamwood, IL 60107

Last Updated 06/13/2022 06:12 AM
Project Title

Kennedy High School Gym Floor

Physical Address View project details and contacts
City, State (County) Chicago, IL 60638   (Cook County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

6,100-square-foot educational facility Provide all labor and materials for the replacement, including finish of the gym floor, per CPS specifications: (Estimated square footage is 6100 square feet, area to be verified by bidders at walkthrough) Scope includes: o Document all existing court markings and equipment inserts or anchors. New court markings are to be placed in the same locations as existing o Remove/relocate bleachers o Removal and disposal of existing wood flooring and subflooring o Inspection existing sleepers, bid to include all materials and labor to correct or replace up to 10% of sleepers which could be found to be defective. If more than 10% of sleepers require repair or replacement, change order to be requested o Install sleepers required to provide sound attachment of substrate. o Underlayment - plywood sheathing at right angles to long dimension of room (or at right angles to the main playing court). Butting ends and sides loosely. o Install flooring in accordance with CPS Specifications, sample options to be provided to School Principal for approval. o Ensure gymnasium flooring is leveled, sanded and finished according to CPS Specifications below. o Game Lines: Apply game lines, markings to match original, between seal and first coat of finish. All lines to be laid out to meet current High School (IHSA) game court regulations. o Apply game lines accurately, straight with sharp edges in colors selected by the Principal. o Provide center court school logo per School Administration approval. Provide 3' wide border line at competition basketball court. o Install vent cove base to walls with base cement or screws. Use pre-molded outside corners and mitered inside corners. o Install aluminum thresholds anchored to concrete beyond the limits of wood floor system. o Install volleyball sleeves and cover plates in accordance with manufacturer's instructions and CPS Specifications. o Reinstall bleachers

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents