Similar Projects
Equipment Purchase and Delivery for Various County
Alteration
Bidding
Tampa, FL

Refurbishment of Radiation Portal Monitors
Post-Bid
Palm Beach, FL

500 Gallon Water Trailer
Post-Bid
FL

Kelly Water Treatment System
Results
Gainesville, FL 32601

As-Needed Electrical Panel Enclosures
Term Contract
Results
FL

Parrish Medical Center Lab Equipment Replacement and Renovation
Renovation, Alteration - 7,014 SF
Construction
$165,000 est. value
Titusville, FL 32780

Ultraviolet Disinfection Equipment
Post-Bid
Panama City, FL

Sign Materials Reflective Sheeting
Results
Kissimmee, FL 34741

HHMC Operating Room Ultrasonic Aspirator
Post-Bid
Daytona Beach, FL 32114

Cafeteria Large Equipment
Results
FL

Air Compressor with Trailer
Post-Bid
FL

Two-Way Radios and Repeaters
Results
Kissimmee, FL

Various Sized Containers for Hillsborough County Fire Rescue
Post-Bid
FL

Mechanical Joint Restraining Devices, Purchase/Deliver
Term Contract
Results
FL

Mini Excavator with Attachments
Post-Bid
Tallahassee, FL

Reported 06/04/2022 12:00 AM
Project Title

Sludge Dewatering Screw Press

Physical Address View project details and contacts
City, State (County) Bowling Green, FL   (Hardee County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. Manufacturer shall furnish and verify installation of one (1) skid mounted sludge dewatering screw press. The screw press shall be manufactured from AISI 304L stainless steel shapes. Fabrication and assembly shall be in conformance with the product specifications and drawings. B. Manufacturer shall furnish a complete dewatering system including skid, screw press, drive motors, gear reducers, support legs, anchor bolts, polymer station, piping and wiring, controls, and all accessories and appurtenances specified or otherwise required for a complete and properly operating installation. C. Owner/Owner’s Designee shall coordinate all details of the equipment with other related parts of the work and shall verify that all structures, piping, wiring, and equipment components are compatible. Owner/Owner’s Designee shall be responsible for all structural and other alterations required to accommodate equipment differing in dimensions or other characteristics from these specifications and drawings. D. Equipment will be installed according to instructions and recommendations of the equipment manufacturer. E. Power supply for main control panel is 460 Volts, 60 Hz, 3-phase. The polymer makedown system needs a separate 120 VAC, 60 Hz, single phase power supply.

Details

Division 46 - Water and Wastewater Equipment, Residuals Dewatering Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents