Similar Projects
Sawmill Property Parks & Rec. Facility-Phase 4 - 16-PR-003 - Accomack County
Infrastructure
Conception
$525,000 CJ est. value
Accomac, VA 23301

Parking Lots Repaving - 08-PW-024 - Accomack County
Infrastructure
Conception
$450,000 CJ est. value
Accomac, VA 23301

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Bidding
$10,000,000 CJ est. value
Bassett, VA 24055

Road Reconstruction
Infrastructure
Bidding
$3,112,000 CJ est. value
Onancock, VA 23417

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Schooner Bay Boat Ramp Replacement
Infrastructure
Results
Onancock, VA 23417

Case Coal, Llc Bond Forfeiture
Alteration
Results
$110,000 to $180,000 est. value
Duffield, VA 24244

Route 602 Reconstruction - 20-RD-001 - Accomack County
Infrastructure
Conception
$3,992,306 CJ est. value
Accomac, VA 23301

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23325

Hack's Neck Landing Site Improvements
Infrastructure
Results
Accomac, VA

US 13 @ Route 648 - 21-RD-003 - Accomack County
Infrastructure
Conception
$764,587 CJ est. value
Accomac, VA 23301

Install Commercial Filtration System (Pump, Filter and Electrical) at the Mcmath Park Water Feature
Infrastructure
Post-Bid
$40,000 CJ est. value
Onley, VA 23418

Merry Point Dock Pile Installation
Infrastructure
Results

County Building Needs - 08-PW-015 - Accomack County
Demolition, New Construction, Renovation, Infrastructure - 11,000 SF
Conception
$2,500,000 CJ est. value
Accomac, VA 23301

Last Updated 01/12/2023 04:04 PM
Project Title

Greenbackville Harbor Renovations Phase V - 22-PW-002 - Accomack County

Physical Address View project details and contacts
City, State (County) Accomac, VA 23301   (Accomack County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace approximatly 660 LF of dock to complete the final phase of the Greenbackville Harbor Reonavations. Budget request includes construction and engineering. This project is included in the County's 2023-2027 Capital Improvement Plan (CIP). As of January 12, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents