Similar Projects
Whispering Pines
New Construction, Infrastructure
Conception
$60,000,000 CJ est. value
Canton, GA 30115

Univeter Road Mixed-Use Development
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Canton, GA 30115

Woodstock Xpress Park and Ride Lot Asphalt Paving
Infrastructure
Design
$300,000 est. value
Woodstock, GA 30189

Holly Springs City Hall
New Construction, Infrastructure - 16,000 SF
Design
$6,000,000 CJ est. value
Holly Springs, GA 30115

Precast Parking Deck Project
Infrastructure
Bidding
$2,500,000 CJ est. value
Holly Springs, GA 30115

Precast Parking Deck Project
Infrastructure
Bidding
$2,500,000 CJ est. value
Holly Springs, GA 30115

Carver Lane and Signal Installation
Infrastructure
Post-Bid
Lebanon, GA

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Streetscapes III Sidewalk Phase
Results
Woodstock, GA

2021 LMIG Street Repairs
Infrastructure
Results
Canton, GA

212 Ridge Rd Medical Office Building / Aylo Family Medicine
New Construction, Infrastructure - 13,476 SF
Construction
$3,200,000 CJ est. value
Canton, GA 30114

Construction Services- Fire Station 32 Addition
Addition, Demolition, New Construction, Infrastructure - 2,750 SF
Construction
$1,851,500 CJ est. value
Canton, GA 30115

Prominence Point Parkway Apartment Development
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Canton, GA 30114

Woodstock City Center
New Construction, Infrastructure - 70,000 SF
Pending Verification
$40,000,000 CJ est. value
Woodstock, GA 30188

Rope Mill Lane Climate-Controlled Self-Storage Facility
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Woodstock, GA 30188

Last Updated 02/16/2023 11:39 PM
Project Title

LMIG Multimodal and Safety Access: SR 92 Pedestrian Improvements

Physical Address View project details and contacts
City, State (County) Woodstock, GA 30188   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $229,936 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Woodstock, Georgia, herein referred to as the City, is accepting bids from qualified contractors for the purpose of installing concrete sidewalks, concrete headwalls, ADA ramps, relocation of pedestrian signals, and landscaping improvements. The project area begins near the Noonday Creek Trail entrance on HWY 92 and will end at Woodpark Place. RFB details and document information may be found by visiting Vendor Registry or Georgia Procurement Registry. All questions must be submitted through Vendor Registry. Deadline for questions will be Monday, February 6th, at 5 pm. All bidders shall be prequalified with the Georgia Department of Transportation prior to submission of the bid. Pricing should be itemized for the project. The contractor shall be responsible for furnishing all materials and labor to complete the project and shall coordinate construction dates and times with the City of Woodstock, Georgia Public Works Director. Pricing shall be valid for a period of 60 days after the RFB submittal date. All work must be approved prior to the release of payment. All work is expected to be completed within 90 days after a notice to proceed has been issued, pending any unnatural weather occurrence. Bidder further agrees to pay as liquidated damages the sum of $250 per each consecutive calendar day that the Bidder shall be in default after the date stipulated in the contract for completing the work. OWNER requires a bid bond* or a certified check in the amount of five percent (5%) of the total bid to be enclosed with the bid at the time of bid opening. Check will be made payable to City of Woodstock, Georgia. The successful bidder will be required to furnish OWNER with Insurance, Workman's Compensation Insurance, and Performance and Payment Bonds* in the amount of one-hundred percent (100%) of the total bid. The Contractor shall submit a progress payment request after thirty (30) days for the completed work. The City shall make a progress payment to the Contractor on the basis of a duly certified and approved progress payment for the work performed during the thirty (30) days under this contract, but to insure the proper performance of this Contract, the City shall retain five percent (5%) of the amount of each pay app as retainage if such work is satisfactory and completed on schedule as determined with the City. CONTRACTORS and SUBCONTRACTORS bidding on this Project will be required to comply with all Federal, State, territorial, and local laws. The City reserves the right to accept or reject any and all bids or any or parts of a bid wherein its judgment, it will be in the best interest of the City; waive any technicalities/informalities in the RFB document and bid process; and to qualify and award any or all of this contract in any manner in which the City, acting in the sole and exclusive exercise of its discretion, deems to be in the Citys best interest. If no acceptable bid is received, the City also reserves the right to re-solicit bids, at its sole discretion. For further information regarding this RFB, please call 770-592-6000 ext. 1205. * Surety companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents