Similar Projects
Last Updated | 02/28/2020 03:24 PM |
Project Title | North Creek Stormwater Outfall Restoration |
Physical Address | View project details and contacts |
City, State (County) | Everett, MA 02149 (Middlesex County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $300,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work includes replacement of a failed headwall and restoration of the drainage channel. Site preparation work includes installing site controls, clearing brush and vegetation, removing invasive plant species, dredging the North Creek stormwater outfall, removing an existing pipe end section, and saw-cutting the existing concrete pipe to create a clean edge with sound concrete. Restoration work includes pouring a new cast-in-place headwall with wingwalls for the culvert end, installing riprap scour protection at the outfall, and re-grading the channel in the work area. A new wood railing and gate will be installed along the Northern Strand Community Trail to discourage public access into the outfall area |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |