Similar Projects
Last Updated | 11/17/2022 08:38 AM |
Project Title | Chippewa Correctional Facility - Replace Emergency Generator |
Physical Address | View project details and contacts |
City, State (County) | Kinross Charter Township, MI 49788 (Chippewa County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $674,014 [brand] Estimate |
Plans Available from | Electrical Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Chippewa Correctional Facility (West) (URF): 1. Remove the duct work and replace with metal duct work for the mechanical room exhaust fan located in the mechanical/ generator building (refer to drawings for exact location). 2. Install two new above ground fuel tank(s) that will support the generator for 72 hours. 3. Install one new day fuel tank that will support the generator start up fuel in rush. Chippewa Correctional Facility (East) (URF): 1. Replace existing emergency generator. 2. Replace main ATS. 3. Install new emergency panelboard for freezers and cooler. 4. Install new ATS for freezers and cooler. 5. Install new manual camlock transfer switch. 6. Replace building 900 (Nebbish Unit) ATS. 7. Install one new day fuel tank that will support the generator start up fuel in rush. ACCEPTING QUESTIONS UNTIL: October 6, 2022, at 2 PM |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |