Project Title | Estacada High School Gym Seismic Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Estacada, OR 97023 (Clackamas County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2025 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $2,498,072 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Estacada School District 108 is seeking proposals from firms for the architectural, structural, mechanical and electrical design for the Seismic Rehabilitation of the Estacada High School Gym (the"Project"), located at 355 NE 6th St, Estacada, Oregon 97023. The building structure was built in 1962. In 2023, the District applied for and received a Seismic Rehabilitation Grant ("SRG") for the Project through the Infrastructure Finance Authority: Business Oregon, based on the application prepared by WRK Engineering, Inc. The intent of this RFP is for the consultant to provide an integrated design solution for the entire building. As part of this grant, a preliminary rehabilitation feasibility report was prepared for each portion of the project and is enclosed. The District was awarded $2,498,000 for the design and construction of the Estacada High School Gym Seismic Rehabilitation, with $3,319,753 of that amount allocated to architectural and engineering services; $69,946 to construction management and $1,743,569 to construction costs. Construction Budget: The construction budget shall not exceed $1,898,600.00. Question Deadline 01/10/2024 at 5:00 PM PT Questions and comments pertaining to this solicitation must be submitted in writing according to the Proposal and Award Timeline to: For technical questions / clarifications: Brian Knight, WRK Engineers, Inc. brian@wkrengrs.com For Questions regarding the RFP process: Brian Knight, WRK Engineers, Inc. brian@wkrengrs.com The District intends to use the CM/GC procurement project delivery method for this Project. Pre-Design/Schematic Design would begin immediately upon award and approval of the resulting design contract. Construction is anticipated to start on June 21, 2024, with the Project completion expected by August 23, 2024. The Project may be vacated during the construction period. As of September 18, 2023 a design team has been identified. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |