Similar Projects
Preventative Maintenance for Variable Frequency Drives
Term Contract
Post-Bid
Lincoln, NE

Heat Trace Control Panels
Alteration
Post-Bid
Lincoln, NE

Inspection and PM for Electrical Power Equipment - LWS Pumping Stations
Term Contract
Results
Lincoln, NE

Lincoln Water Distribution PLC Upgrades
Alteration
Results
Lincoln, NE

Purchase 115kV Transformer
Term Contract
Post-Bid
Lincoln, NE 68524

Everett Elementary School Indoor Air Quality and Improvements
Alteration
Results
Lincoln, NE 68502

Electrician Services
Alteration
Post-Bid
Lincoln, NE

Installation of Solar Stock Well and Water Distribution System
Infrastructure, Alteration
Results
Lincoln, NE

Purchase of Power Cable 500EPR CU Black
Alteration
Post-Bid
Lincoln, NE

Electrician Labor Contract
Alteration
Results
Lincoln, NE

Purchase Southern Yellow Pine Utility Poles (LOC)
Alteration
Post-Bid
Lincoln, NE

Nebraska Hall Replace Backup Generator
Renovation
Results
$159,967 CJ est. value
Lincoln, NE 68508

Purchase of 15KV Pad-mount Switchgear
Term Contract
Post-Bid
Lincoln, NE 68508

Purchase 15kV Vacuum Capacitor Switches
Alteration
Post-Bid
Lincoln, NE

Purchase Southern Yellow Pine Utility Poles (SVC)
Alteration
Post-Bid
Lincoln, NE

Last Updated 04/28/2023 05:36 PM
Project Title

Power Switchgear Center

Physical Address View project details and contacts
City, State (County) Lincoln, NE 68521   (Lancaster County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,335,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The documents upon which all bids are to be based include the Instructions to Bidders, Performance and Labor and Material Payment Bond, Contract, General Conditions, Special Conditions, Technical Specifications, Drawings (if any), and all written modifications incorporated in these Documents before their execution, which are collectively referred to as the Contract Documents. Each bid must include the full name and business address of the bidder and be legibly signed by the bidder. A bid by a firm or organization other than a corporation must include the name and address of each member. A bid by a corporation must be signed in the name of such corporation by the president of the corporation or by an officer of the corporation authorized by it to sign the bid. If any officer other than the president signs the bid, a copy of the corporate authority authorizing the officer to sign the bid shall be attached to the bid. Bids shall be based on the specifications and descriptive matter of the construction project, as described by LES. Bids shall not contain any recapitulation of the specifications and descriptive matter describing the work to be performed. Except when otherwise specified, bidders must quote on all base items appearing on the proposal form. Any alterations or erasures in the bid document shall be initialed by the authorized representative signing the bid. No oral or telephone proposals or modifications of the bid will be considered. In the event of a discrepancy between the prices quoted in the bidder's proposal, in words and figures, the words shall control. In the event individual bid items are incorrectly totaled, the correct total will control. With each bid, the bidder shall submit the number of prints, specifications and all information required by LES in its proposal form. Prior to bid submission, all bidders shall visit and carefully inspect the proposed site of the work and fully inform themselves as to the general or special conditions that may be encountered. Failure to inspect the site will not relieve bidders from responsibility for properly estimating the difficulty and cost of successfully performing the work. Communications and technical questions concerning this Bid shall be submitted using the LES Online Procurement System. LES may, in its sole discretion, reject any or all bids, or waive minor defects, irregularities, or informalities therein. LES will award the contract to the lowest responsible bidder whose bid best complies with the Contract Documents. At the option of LES, in order to demonstrate its qualifications to perform the work described herein, each bidder shall be prepared to submit, within five days after the bids are opened, a detailed written showing of financial responsibility, relevant similar experience, present commitments, and such other relevant information as may be required by LES. Each bidder shall state in their bid the date upon which the construction project shall be completed. The time required for such completion is hereby made an essential element of the contract. Bids received after the time and date established for receiving bids will be rejected. LES shall not incur any liability for any costs incurred by vendors in replying to this solicitation, including any activity related to responding on this solicitation. Clarification Deadline: 3/30/2023 4:00 PM

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents