Similar Projects
On and Off Ramp Construction - TH 23
Infrastructure
Conception
$1,700,000 est. value
Willmar, MN 56201

Block 25 Lofts
New Construction, Infrastructure
Conception
$9,270,000 CJ est. value
Willmar, MN 56201

City Hall and Community Center - City of Willmar
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Willmar, MN 56201

Willmar Public School District Gymnasium / Ancillary Space Addition
Addition, Infrastructure - 19,540 SF
Bidding
$8,034,750 CJ est. value
Willmar, MN 56201

22nd St NE Storm Sewer Improvement
Infrastructure
Bidding
$324,357 CJ est. value
Dovre Township, MN 56201

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

D8 Pavement Rejuvenation-Tracy and Slayton Stations
Infrastructure
Post-Bid
$200,000 est. value
Willmar, MN

Rubberized Asphalt Crack Filling
Results
MN

Chloride Application
Results
MN

Block 25 Lofts
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Willmar, MN 56201

Block 25 Lofts
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Willmar, MN 56201

Eagle Lake Lift Station 7, 8, and 9
Infrastructure, Renovation
Bidding
$615,000 CJ est. value
Willmar, MN 56201

Bituminous Mill and Overlay
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Willmar, MN 56201

Edgeline Striping
Renovation
Results
Willmar, MN

Lakeland Drive NE Multi-Family Development
New Construction, Infrastructure
Pending Verification
$81,400,000 CJ est. value
Willmar, MN 56201

Last Updated 01/04/2024 07:38 AM
Project Title

Grading, Bituminous Mill and Surfacing, Retaining Wall Rehabilitation, ADA Improvements and Lighting

Physical Address View project details and contacts
City, State (County) New London, MN 56273   (Kandiyohi County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $922,030 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

3407-93 (TH 9=210), 3408-93 (TH 23=004) STBG 3422(184) In Kandiyohi County on TH 9 from TH 23 to 1st Ave SE and on TH 23 at TH 9 Grading, Bituminous Mill and Surfacing, Retaining Wall Rehabilitation, ADA Improvements and Lighting 0.835 Miles DBE Goal 9.4 MNDOT - 004 - Grading, Bituminous Mill and Surfacing, Retaining Wall Rehabilitation, ADA Improvements and Lighting The workforce participation goals for this Project are: Minority: 15% Women: 12% Direct questions about this Project, including pre-bid questions, to Alan Setrum at 320-214-6321 or Alan.Setrum@state.mn.us.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents