Similar Projects
Babbitt Ranch Wind
New Construction, Infrastructure
Design
$39,500,000 CJ est. value
Williams, AZ 86046

Babbitt Ranch Solar and Storage
New Construction, Infrastructure
Design
$98,000,000 CJ est. value
Williams, AZ 86046

GRCA 190083 - Improve Potable Water Supply to Innercanyon and South Rim, Transcanyon Water Distribution Pipeline, Grand Canyon National Park
Infrastructure
Bidding
$10,000,000 CJ est. value
Grand Canyon, AZ 86023

2 City Entry Pylon Signs
Infrastructure
Bidding
$170,000 CJ est. value
Page, AZ 86040

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Road Construction IDIQ - Coconino & Kaibab National Forests
Results
$1,000,000 to $10,000,000 est. value
Flagstaff, AZ 86001

Slurry Seal FY21
Results
Page, AZ

Antelope Canyon Resort & RV Park
Construction
$2,700,000 est. value
Page, AZ

Antelope Canyon Resort & RV Park
Construction
$2,700,000 est. value
Page, AZ

Flagstaff Elkwood Mixed-Use
New Construction, Infrastructure - 6,000 SF
Design
$84,000,000 CJ est. value
Flagstaff, AZ 86001

Painted Desert Demonstration Projects - Construction Services at 19722 Leupp Road
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Flagstaff, AZ 86004

Route N21(2) - Kaibeto Chapter - Road Maintenance
Infrastructure
Post-Bid
Kaibito, AZ

CMAR - Design and Construction Services for Beulah/University Roadway Project
Infrastructure
Results
$11,700,000 to $11,800,000 est. value
Flagstaff, AZ

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Post-Bid
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

Last Updated 09/06/2022 06:01 AM
Project Title

Construction - Roads NFSR 100 Surfacing and Stabilization

Physical Address View project details and contacts
City, State (County) Gray Mountain, AZ 86020   (Coconino County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,742,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Aug 22, 2022 Contract Award Number: 127EAX22C0026 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: MARTINEZ SERVICES, INC. Contractor Awarded Address: Merritt Island, FL 32953-4827 USA Base and All Options Value (Total Contract Value): $2742500.00 Project: The USDA Forest Service, Apache--Sitgreaves National Forests, Springerville, Arizona, has a requirement for NFSR 100 Road Reconditioning, Aggregate Surfacing, and Road Stabilization on the Black Mesa Ranger District, Coconino County, Arizona. Work will include re-establishing the road template on NFSR 100, furnishing and placing a 4 inch lift of aggregate base material (3/4 inch minus), and stabilizing 4 inch aggregate with 80/20 lignosulphonate/magnesium chloride blend product. Placement of materials will occur from the intersection of NFSR 169 and NFSR 100 (MP 7.28), north for approximately 5 miles to mile post 2.28. Additional road reconditioning will continue on NFSR 100 as funding allows in 0.1-mile increments as shown in the Schedule of Items. Magnitude of project: Between $1,000,000 to $5,000,000. This solicitation is set-aside 100 percent for Small Business under the NAICS 237310 ($39.5 Million). Award will be based on Best Value - Tradeoffs. The Government anticipates awarding a Firm Fixed-Price contract. No Formal Site Visit will be scheduled. Roads in this area of the forest are closed until after April 15, 2022. However, unofficial site visits requests may be made with Contracting Officer's Representative (COR), Paul Gerber (contact via email: paul.gerber@usda.gov) after April 15th up through May 10, 2022. Notify the Contracting Officer if requesting an unofficial site visit from COR: warren.abbott@usda.gov. Offer Submission: Interested parties should submit an offer in accordance with the requirements of the solicitation. Responses to this solicitation should be sent by email in electronic format to the Contracting Officer. All submittal and deadline requirements shall be met by use of email: warren.abbott@usda.gov. Deadline for submission of offers shall be May 19, 2022, 4:00 p.m Pacific Daylight Time. Deadline for submission of offers shall be May 19, 2022, 4:00 p.m. (Pacific Daylight Time - matches time zone in advertisement in SAM). Responses to the RFP shall be sent only to the Contracting Officer. Proposal packages should be sent by email and should contain the Solicitation Number in the subject line for the email. Email: warren.abbott@usda.gov Proposals that need to be sent by US Mail shall use the address designated in box 8 of SF 1442 to attention of Contracting Officer (next page) Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days from notice to proceed. The time stated for completion shall include final cleanup of the premises.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents