Similar Projects
Roxborough Lift Station Pump P-201 Replacement
Renovation
Bidding
$200,000 est. value
Littleton, CO 80125

The Bijou Subdivision Phase 1
Infrastructure
Bidding
Bellvue, CO 80512

Milavec West Pump Station Screen and Filter Improvements
Post-Bid
Frederick, CO 80530

ERWSD & UERWA Water Storage Tank and Booster Pump Stations Hatch Improvements
Post-Bid
Vail, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

WWTF Headworks and Lift Station Rehabilitation
Results
Less than $408,900 est. value
Lamar, CO 81052

VCC Lift Station Design-Build Rehabilitation
Post-Bid
Aurora, CO 80016

Washington Street Stormwater Lift Station
Results
Less than $530,750 est. value
Lamar, CO 81052

Non-Potable Irrigation Pump Stations for Water and Sewer Department
New Construction
Post-Bid
Greeley, CO 80631

Northern Water Supply Project North Booster Pump Station (NBPS) Overflow Channel Project
Results
Aurora, CO 80016

South St. Vrain Creek Pipeline Pump Station Construction
Renovation
Post-Bid
Longmont, Lyons, CO 80540

29th Street Pump Station
Results
$2,000,000 to $3,000,000 est. value
Pueblo, CO

CMAR Non-Potable Irrigation Pump Stations
New Construction
Post-Bid
Greeley, CO 80631

Tuscany Non-Potable Grading and Irrigation
Results
Less than $792,769 est. value
Evans, CO

Quail Dunes Golf Course Pump Station Replacement
New Construction, Infrastructure
Post-Bid
Fort Morgan, CO

Reported 04/30/2022 12:00 AM
Project Title

Waste Water Lift Station Pump and Grinder Replacement

Physical Address View project details and contacts
City, State (County) Black Hawk, CO 80422   (Gilpin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals from qualified contractors for the replacement of the waster water system pumps and grinder at the Gilpin County Justice Center. The selected individual or firm will be responsible for ensuring that proper permits are in place and all current Gilpin County building codes, applicable codes, regulations, environmental curve flows and functional specific design needs are met and expressed in the design phase.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 46 - Water and Wastewater Equipment, Grinding and Shredding Equipment, Inline Grinders.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents