Similar Projects
Cedar Riverside Recreation Center
New Construction
Conception
$20,200,000 est. value
Minneapolis, MN 55450

Jordan Park Pool
Alteration
Conception
$1,500,000 est. value
Minneapolis, MN 55411

Wooddale Station Outdoor Plaza
New Construction
Design
Saint Louis Park, MN

Swimming Pool Bulkhead Replacement for Jean K. Freeman Aquatic Center
Alteration
Bidding
Minneapolis, MN 55455

Park High School Tennis Court Rehabilitation
Renovation
Bidding
Cottage Grove, MN

Excelsior Commons Bandshell
Post-Bid
Minnetonka, MN

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

Upgrades of ADA Pedestrian Ramps
Results
Minneapolis, MN 55401

South Lake Minnetonka Public Safety Facility Improvements
Results
Shorewood, MN

The Bar Method Studio Building
Renovation - 1,724 SF
Construction
Edina, MN 55424

Yess Yoga Studio
New Construction
Construction
Minneapolis, MN 55404

Dayton's Building Conversion
Renovation - 45,000 SF
Pending Verification
$350,000,000 est. value
Minneapolis, MN 55402

Eloise Butler Wildflower Garden - Martha Crone Shelter Renovation
Renovation
Bidding
Minneapolis, MN 55405

Meadowbrook Elementary School Parking Lot Improvements
Post-Bid
Golden Valley, MN 55422

METRO D Line BRT
Results
MN

Reported 11/04/2021 12:00 AM
Project Title

North Commons Park Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55411   (Hennepin County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Fitness Center, Misc. Recreational, Sidewalks/Parking Lot, Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Request for Qualifications seeks a team of consultants capable for preparing design and construction documents and performing construction contract administration servicesfor the first phase improvements guided by the North Commons Park Master Plan (included within the North Service Area Master Plan) to include: • a new recreation center, • a new water park, • a new parking lot, • demolition of existing facilities, and • associated site improvements

Details

Fitness Center, New Construction, Misc. Recreational, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents