Similar Projects
Chesterfield Sports Complex
New Construction - 98,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Chesterfield, MO 63005

Youth Ballfield Complex
New Construction
Post-Bid
$4,250,000 est. value
Cape Girardeau, MO

Preservation Square Phase 2A - Site Prep Package
Renovation
Post-Bid
Saint Louis, MO 63106

Sitework Services
Term Contract
Results
Columbia, MO

McGrath Elementary School and ECC Sitework Package
Results
Brentwood, MO 63144

Indoor Athletic Complex
New Construction
Pending Verification
Saint Louis, MO

Preservation Square Phase 2B - Site Prep Package
Infrastructure
Post-Bid
Saint Louis, MO 63106

Weise House in Street Ferdinand Park Basement Work and Grading
Infrastructure
Results
Florissant, MO

FSD Indoor Practice Facility Phase 2
New Construction
Post-Bid
Farmington, MO 63640

Jefferson City HS Athletic Improvements
Renovation
Results
Jefferson City, MO 65101

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Gateway Arch National Park Site Improvements
Infrastructure
Results
Saint Louis, MO

Excavating and General Maintenance Services
Term Contract, Infrastructure
Post-Bid
Sparta, MO

Engine House 2 and 3
New Construction
Results
Saint Louis, Wildwood, MO 63005

Heine Meine Athletic Complex
Renovation
Post-Bid
MO

Last Updated 08/31/2022 08:04 AM
Project Title

Multi-Sport Restroom/Concession/Press Box Building

Physical Address View project details and contacts
City, State (County) Springfield, MO 65807   (Greene County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $387,100 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor and material to construct a new Multi-Sport Restroom/Concession/Press Box Building at Kickapoo High School. Question Cutoff Date 5/26/2022 04:30:00 PM (ET) A Notice to Proceed will be sent on April 27, 2022 Contractor will have the work substantially complete by August 5, 2022. Final Completion shall be August 19, 2022 for use for the fall softball and soccer seasons It is the intent of the Owner to begin work upon Board of Education approval at the June 21, 2022 meeting. A Notice to Proceed will be sent on June 22, 2022. Work will not begin until after the completion of the fall softball and soccer seasons, on or about 11/15/22. Contractor will have the work substantially complete by May 1, 2023. Final Completion shall be May 15, 2023.

Details

Athletic Facility, 2 Stories Above Grade, 1,044 SF New Construction, Building, Food/Beverage Service, New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents