Similar Projects
RFQ Contractor - Closed Circuit Television (CCTV) Services
Term Contract
Design
New York, NY 10007

100 Gold Street Fire Alarm Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
New York, NY 10038

Cabling and IT Equipment Removal Services
Term Contract
Sub-Bidding
New York, NY 10024

Design Build Services for Passenger Identification CCTV
Alteration
Post-Bid
$50,000,000 to $100,000,000 est. value
Bronx, Brooklyn, Manhattan, NY

Electronic Keyless Access Control Locks
Alteration
Post-Bid
New York, NY

Physical Security/Access Control Systems (PS/AC) Multiple Award Construction Contract (MACC)
Results
Less than $99,000,000 est. value

RFI - Home Intrusion Detection Systems
Results

Telecommunications Network Cabling Services
Term Contract
Post-Bid
New York, NY

Installation of 15 Alarm Systems at Various NYCT Agency Facilities
Results
NY

Purchase and Install 28 Patient Room TV's in 8N
Term Contract, Infrastructure
Post-Bid
New York, NY 10010

Telecommunications Infrastructure Testing Services - Worldwide
Results

Nationwide Alarm Maintenance and Monitoring #3
Term Contract
Post-Bid

6350--Police CCTV Operations Control Upgrade - VA New York Harbor Healthcare System
Term Contract
Results
Brooklyn, Manhattan, Saint Albans, NY

Furnish, Deliver and Install Audio Video Equipment
Term Contract, Alteration
Post-Bid
New York, NY 10031

Furnishing Installing and Testing Connection Oriented Ethernet (Coe) Phase 3B-2
Alteration
Results
$10,000,000 est. value
New York, NY

Last Updated 01/09/2023 10:31 PM
Project Title

Kaufman Hall Access Control - Rebid

Physical Address View project details and contacts
City, State (County) New York, NY 10001   (New York County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $999,700 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions accepted up to October 26th, 2022 on or before 3:00 PM Send All questions to purchasing at: purchasingbids@fitnyc.edu Service-Disabled Veteran-Owned Set Aside: No Contract term: Must be completed no later than August 4, 2023 County(ies): All NYS counties Location: Kaufman Hall Business entities awarded an identical or substantially similar procurement contract within the past five years: None The Work of the Project is defined by the immediately following Project Description herein below and by the Contract Documents. Project Description: Provide labor, materials, tests, tools, and equipment to complete the Kaufman Hall Access Control installation project. The winning bidder will perform the following: Procure the Allegion locks, gateways and associated components. The winning bidder is required to purchase the Allegion locks and associated components through an authorized AMAG dealer. Securitas is an authorized dealer. See Securitas contact info below. Victoria Sena Securitas Electronic Security, Inc. O: 914-872-4478, M: 914-708-7969 Victoria.sena@securitases.com The CAT6 cable can be procured through a distributor of choice. Install the gateways, run the CAT6 cable, terminate the gateways to the patch panels in the IT Network closets. A certification report must be provided for all installed CAT6 cable per TIA industry standards. Remove the Saflock units and Install the Allegion locks on all designated doors per the design layout The Contractor may begin survey and procurement of materials immediately following award. This project will be implemented in TWO PHASES in the following way: Phase I o Removal of Saflok units and Installation of CAT6 cabling, gateways and Allegion locks can commence as soon as material has been received for all non-resident rooms in the building that are identified in the design layout, which include o Student Common use rooms o UG2/Facilities rooms o Public Safety office o IT Closets o Residential Life Office Phase II o Removal of Saflok units and installation of Allegion locks on resident apartment doors can commence on floors 1 - 15 starting on May 25th, 2023, (or the first business day following commencement), with completion no later than August 4th, 2023. THIS IS A HARD DEADLINE o The completion date for any or all non-resident rooms will be August 31st, 2023 The installation of all equipment in accordance with the manufacturer's installation/operation & maintenance manuals & instructions shall be followed. Awarded contractor shall be responsible to repair and repaint any walls due to damage during the installation. The awarded contractor will also agree to store all of the equipment of their premises until installation begins.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents