Similar Projects
KMLWTP Chemical Pump Replacement
Alteration
Bidding
Norfolk, VA 23508

Lake Mooney Water Treatment Facility Sludge Thickening and Dewatering Improvements
Renovation
Bidding
Fredericksburg, VA 22406

2020 Waterworks Improvements Phase II Project
Post-Bid
Radford, VA

On Call Materials and Construction Related Testing Services
Term Contract
Post-Bid
Winchester, VA 22601

Crozet Water Treatment Plant - Expansion and Rehabilitation
Results
$7,170,000 est. value
Charlottesville, VA

James River SWIFT Facility (GN016360) and James River Treatment Plant Advanced Nutrient Reduction Improvements (JR013400)
Results
$237,000,000 est. value
Newport News, VA 23602

Shenandoah Valley Organic Packaging Plant Expansion
New Construction - 132,600 SF
Pending Verification
$10,000,000 CJ est. value
Harrisonburg, VA 22802

Water Treatment Plant Improvements
Renovation
Bidding
Amherst, VA

Filter Media and Silica Sand Removal in Equalization Basin
Post-Bid
Norfolk, VA 23502

Moores Bridges Water Treatment Plant Valve Repair and Replacement
Results
Less than $1,718,800 est. value
Norfolk, VA 23510

Abert Water Treatment Plant Dewatering and Disposal
New Construction
Bidding
Lynchburg, VA

Qualification of CMAR - Quarry A (Milestone Reservoir) and Raw Water Pumping Station
Post-Bid
VA

King William Treatment Plant Lab Demolition Renovation - Sup Sys
Renovation, Demolition
Results
Hampton, VA

Temporary Mobile Dewatering Services at Boat Harbor Treatment Plant
Post-Bid
Hampton, Newport News, VA 23607

Lake Kilby WTF Residuals Lagoon Effluent Header Replacement Project
Results
Portsmouth, VA

Reported 11/11/2021 12:00 AM
Project Title

Nansemond Treatment Plant Advanced Nutrient Reduction Improvements Phase II(NP013820)

Physical Address View project details and contacts
City, State (County) Suffolk, VA 23435   (Suffolk City County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of design, construction, and commissioning of the Nansemond Treatment Plant Advanced Nutrient Reduction Improvements Phase II (NP013820) project.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents