Similar Projects
Reported | 03/12/2022 12:00 AM |
Project Title | Telford Unit - Replace Hot Water and Steam Piping |
Physical Address | View project details and contacts |
City, State (County) | New Boston, TX 75570 (Bowie County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replacement of the existing underground steam, condensate, domestic hot water, and hot water return piping between Buildings 6 and 15. Work will include the installation of the new lines above ground using a structural support system between the termination points for these lines, as well as the reconnection of these new lines to existing piping within Buildings 6 and 15, replacement of the condensate receiver and pumps within Building 6, capping and abandonment of the existing underground piping, and associated site and electrical work. Existing piping will remain in service until the scheduled final connections of the new services to the existing boiler. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |