Similar Projects
Slide Repair, Erosion Control, Pipe Work
Infrastructure
Conception
$1,061,000 CJ est. value
Fort Pierre, SD 57532

Slide Repair, Erosion Control, Pipe Work
Infrastructure
Conception
$1,061,000 CJ est. value
Fort Pierre, SD 57532

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP Construction Manager at Risk - Stanley County School District Multi-Purpose Building Project
New Construction, Infrastructure
Bidding
$350,000 CJ est. value
Fort Pierre, SD 57532

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

2022 Fort Pierre Asphalt Surface Treatment
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fort Pierre, SD 57532

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphalt Surface Treatment
Infrastructure
Results

Mill, AC Resurfacing, Full Depth Reclamation, Pipe Work
Infrastructure
Conception
$10,947,000 CJ est. value
Fort Pierre, SD 57532

OSRWSS South Coreline Reservoir and Pump Station No. 1 Upgrades
Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Fort Pierre, SD 57532

2022 Fort Pierre Mill & Overlay
Infrastructure
Post-Bid
Fort Pierre, SD

Water Storage Tank - City of Fort Pierre
New Construction, Infrastructure
Conception
$1,760,000 CJ est. value
Fort Pierre, SD 57532

Last Updated 02/14/2023 02:37 AM
Project Title

AC Surfacing of Shoulders

Physical Address View project details and contacts
City, State (County) Fort Pierre, SD 57532   (Stanley County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $2,877,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US83 - Fm US14 to Onida Length 14.1 As of February 14, 2023, the project is in Design status. Anticipated Construction year is 2025. SDDOT - AC Surfacing of Shoulders *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents