Similar Projects
Dohaney Homes Roof Replacement
Alteration
Bidding
$400,000 est. value
South Amboy, NJ 08879

Asphalt Roof Replacement
Alteration
Bidding
$417,000 est. value
Montville, NJ 07045

2020 CDBG Gutter Guard Project
Renovation - 1,953 SF
Post-Bid
Basking Ridge, NJ 07920

2020 CDBG Roof Replacement Project
Renovation - 2,566 SF
Post-Bid
Bound Brook, NJ 08805

Demarest Firehouse Re-Cladding and Roof Replacement
Results
Demarest, NJ 07627

PEC Partial Roof Replacement Project
Results
Washington, NJ 07882

43 Alexander Street - Capital Improvements 2021
Renovation
Construction
$131,000 est. value
Newark, NJ 07106

24 Hazelwood Avenue and 600 Clinton Avenue Summer 2021 Capital Projects
Infrastructure, Alteration
Construction
$131,000 est. value
Newark, NJ 07106

Municipal Building Roof and HVAC Replacement Project
Alteration
Bidding
$71,000 est. value
Maplewood, NJ 07040

Reroofing Project at Various Schools
Post-Bid
Union, NJ 07083

Roof Coating Application at Ptak Towers
Results
Highlands, NJ 07732

Roofing Repairs - As Needed
Post-Bid
Jersey City, NJ

Roof Replacement at Demarest HS and Old Tappan HS
Results
Less than $1,000,000 est. value
Demarest, NJ 07627

Licensed Roofing Contractor As-Needed
Post-Bid
Atlantic City, NJ

Making Roof Repairs to the Administrative Building at the Salem County Correctional Facility
Results
Salem, Woodstown, NJ 08098

Last Updated 07/04/2022 07:23 AM
Project Title

2022 Roof Replacement for Memorial School

Physical Address View project details and contacts
City, State (County) Lower Township, NJ 08251   (Cape May County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,386,455
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of complete removal of the entire roof system to the structural deck including all metal edge work, gutters, roof drains, flashing, etc. as noted on the drawings and specifications. The roof deck and roof system type are noted on the roof plans. Generally, the new roof system will consist of 5.2 rigid or 1/8” tapered insulation with all joints staggered, ½” overlayment and a 2-ply modified bitumen roof system. Two types of modified bitumen systems are specified. One is a mineral surfaced modified asphalt membrane and the other is mineral surfaced modified coal tar membrane. Provide new wood blocking to accommodate new insulation and gusset height. Maintain consistent metal edge face along entire roof edge. Provide crickets/gussets to divert water to roof drains and accelerate water to gutters as indicated on the new roof plan. In addition, provide crickets to divert water around all roof penetrations/obstructions whether shown on the plans or not. There is an Alternate Bid to remove the existing shingle mansard roof and vented aluminum soffit and replace with a metal roof and vented aluminum soffit.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents