Reported 10/30/2020 12:00 AM
Project Title

Debris Management Services and Emergency Response Management and Recovery Services

Physical Address View project details and contacts
City, State (County) Bradenton, FL 34205   (Manatee County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1) For the purposes of the contract, eligible debris that is piled in immediate close proximity to the street and is accessible from the street with loading equipment (i.e., not behind a fence or other physical obstacle) will be removed. 2) Decommissioning consists of the removal and disposal of all Household Hazardous Waste (HHW), E-Waste, White Goods, and Waste Tires from a Non- Regulated Asbestos Containing Material (RACM) structure at a properly sanctioned facility in accordance with all applicable federal, state and local rules and regulations. 3) Any structurally unsound and unsafe structures will be identified and presented to the County for direction regarding decommissioning. 4) Removal of eligible debris existing in the County will be performed as identified by the County Contract Manager. 5) Once the debris removal vehicle has been issued a load ticket from the County’s authorized representative, the debris removal vehicle will proceed immediately to a County approved TDSR or a County approved Final Disposal Site. The debris removal vehicle will not collect additional debris once a load ticket has been issued. 6) All eligible debris will be removed from ROW. ROW will be cleaned up and damage documented from each location before proceeding to the next location unless directed otherwise by the County’s authorized representative. 7) Entry onto private property for the removal of eligible hazards will only be permitted when directed by the County’s authorized representative. The County will provide specific Right-of-Entry (ROE) legal and operational procedures. 8) The Contractor must provide traffic control as conditions require or as directed by the County Contract Manager. 9) Large debris that cannot be handled by standard debris operations may require the use of low boy trailers or other specialized equipment. Prior to utilizing this equipment, Contractor must receive County approval. This material may be removed at a later date. 10) Final Disposal Sites will vary based on the circumstances at the time. It may be necessary to consolidate and reduce all types of debris prior to reaching final destination. Contractor must be able to reduce all types of debris and consolidate when final disposal exceeds thirty (30) miles for all types of debris if determined to be necessary by the County.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents