Similar Projects
JC Morgan HVAC Replacement
Post-Bid
High Point, NC 27260

20 Ton Air-Cooled Chiller
Post-Bid
Greensboro, NC 27412

Noble Hall AHU Replacement
Results
Less than $365,000 est. value
Greensboro, NC

Smith Technology Building Cooling Tower Replacement
Results
Less than $500,000 est. value
Greensboro, NC

Carver and Webb Halls Fume Hoods Replacement
Post-Bid
Greensboro, NC

McIver HVAC Addition for McIver School
Results
Greensboro, NC 27405

Construction of Ductwork Modifications
Post-Bid
Greensboro, NC 27411

IRC Building Chiller Replacement
Results
Less than $500,000 est. value
Greensboro, NC

HVAC Repair and Maintenance Services
Term Contract
Post-Bid
NC

Chiller Maintenance for the Engineering and Inspections Department
Term Contract
Results
Greensboro, NC 27401

HVAC Water Treatment
Term Contract
Post-Bid
Greensboro, NC 27401

Cooling Tower Replacement Smith High School Project
Results
Greensboro, NC 27406

Cone ES RTU Replacement
Post-Bid
Greensboro, NC 27405

Northwest High Gym AC
Results
Greensboro, NC 27409

Chiller Plant Replacement for Southern Elementary School
Post-Bid
Greensboro, NC 27406

Last Updated 05/11/2020 09:12 AM
Project Title

High Point Mental Health HVAC Renovations

Physical Address View project details and contacts
City, State (County) High Point, NC 27260   (Guilford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition and replacement of all rooftop hvac units,variable air volume (VAV) terminal units, existing HVAC control system, as well as installation of new fire dampers. The new HVAC control system will be an electronic DDC building automation system connecting to and controlling the HVAC system including the existing exhaust fans. Electrical work for this project will include power wiring for the new HVAC equipment including terminal unit electric reheat and the new DDC control system. Related work of the project includes removal and reinstallation of the existing acoustical ceiling, demolition and repair to gypsum wall penetrations, and installation of new roof walkway.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents