Similar Projects
2021 Road Paving
Post-Bid
Chilton, WI

Pond View Estates Road
Infrastructure
Post-Bid
Sherwood, WI 54169

Asphaltic Concrete Pavement
Results
Chilton, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 Crack Seal Program
Infrastructure
Post-Bid
Hilbert, WI 54129

Harrison Ryford Street and Highland Court Culvert and Roadway Construction
Results
WI 54952

2022 Irish Road / Geiser Way / T.I.D. 6 Construction
Infrastructure
Post-Bid
$1,375,000 est. value
Chilton, WI

Saint Charles Road Improvements, Paradise Road to CTH G
Results
Less than $510,000 est. value
Brothertown, WI

Seal Coating, Wedging and Patching of Town Roads and Reconstruction of Sharon Street in St John
Infrastructure
Post-Bid
$200,000 est. value
Hilbert, WI 54129

Saint Charles Road, TRID Improvements
Results
Less than $400,000 est. value
Brothertown, WI

2021 Street Paving Program
Results
WI 54915

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

2021 Pavement Improvements
Results
$64,000 est. value
New Holstein, WI

Chilton Court Street and Madison Street/Breed Street Concrete Pavement
Results
Chilton, WI 53014

2021 Street and Utility Improvements
Results
$225,000 est. value
Hilbert, WI

Last Updated 05/12/2022 02:41 AM
Project Title

State Park Road - Culvert Failure

Physical Address View project details and contacts
City, State (County) Sherwood, WI 54169   (Calumet County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximate quantities and items listed below: - 191 LF of 142" x 91" CMP/Steel Plated Culvert Removal - 191 LF of 126" Aluminized CMP Culvert Construction with Bend - Associated Roadway Replacement - Landscape Restoration

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents